X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304182506000

Well Details

Well ID: 0304182506000
Loading map...
Location: 00/06-25-030-18W4/0
Location Alias: 00/06-25-30-18 W4M
Location Alias 2: 00/06-25-030-18 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 18
Section: 25
County/Municipality: Starland County
Well Name: DEML MICHI 6-25-30-18
Operator Name: Direct Energy Marketing Limited
License Number: 0125827
License Date: 1987-02-13
License Status: RecCertified
Spud Date: 1987-02-13
Final Drill Date: 1987-02-19
Well Total Depth: 1418.00 m
Surface Hole Latitude: 51.594804
Surface Hole Longitude: -112.408544

For data sources see[1][2]

Well History

Date Event
1987-02-13 Obtained License
1987-02-14 Surface Casing Operation Performed
1987-02-19 Drill Stem Test Performed
1987-02-19 Finished Drilling
1987-02-19 Well Log Performed
1987-02-19 Well Mode changed to Drilled and Cased
1987-02-20 Production Casing Operation Performed
1987-02-21 Rig Released
1987-02-25 Perforation Treatment Performed - Jet Perforation
1987-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-27 Perforation Treatment Performed - Jet Perforation
1987-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-01 Perforation Treatment Performed - Jet Perforation
1987-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-03 Perforation Treatment Performed - Jet Perforation
1987-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-08-27 Perforation Treatment Performed - Jet Perforation
1987-08-27 Plug Back Performed
1987-10-14 Well Began Production
1987-10-14 Well Fluid changed to Gas
1987-10-14 Well Mode changed to Flowing
1988-04-01 Well Fluid changed to Gas
1988-04-01 Well Mode changed to Suspended
1990-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-26 Plug Back Performed
1990-03-26 Well Abandoned
1990-03-26 Well Fluid changed to Gas
1990-03-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-02-25 Perforation 1390.00 1392.00 13
1987-08-27 Perforation 1295.00 1298.00 13
1990-03-26 Packing Device Capped w/Cement 1280.00 1288.00 0
1987-02-26 Acid Treatment 1390.00 1392.00 0
1987-02-27 Perforation 1367.00 1370.00 13
1987-02-28 Acid Treatment 1367.00 1370.00 0
1987-03-01 Perforation 1349.00 1352.00 7
1987-03-02 Acid Treatment 1349.00 1352.00 0
1987-03-03 Perforation 1329.00 1332.00 7
1987-03-03 Acid Treatment 1329.00 1332.00 0
1987-08-27 Packing Device Capped w/Cement 1316.00 1324.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 308 0.0 0.0 0.0

For data sources see[5]

References