If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304201709004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.572131,"lon":-112.77549,"icon":""}]} |
Location: 00/09-17-030-20W4/4 | |
Location Alias: 00/09-17-30-20 W4M | |
Location Alias 2: 00/09-17-030-20 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 20 | |
Section: 17 | |
County/Municipality: Starland County | |
Well Name: 981384 DRUM 9-17-30-20 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0320622 | |
License Date: 2004-12-02 | |
License Status: Issued | |
Spud Date: 2004-12-13 | |
Final Drill Date: 2004-12-17 | |
Well Total Depth: 700.00 m | |
Surface Hole Latitude: 51.572131 | |
Surface Hole Longitude: -112.775490 |
Date | Event |
---|---|
2004-12-02 | Obtained License |
2004-12-13 | Surface Casing Operation Performed |
2004-12-17 | Finished Drilling |
2004-12-17 | Well Mode changed to Drilled and Cased |
2004-12-18 | Production Casing Operation Performed |
2004-12-18 | Rig Released |
2004-12-24 | Well Log Performed |
2004-12-30 | Perforation Treatment Performed - Jet Perforation |
2005-01-27 | Perforation Treatment Performed - Fractured |
2005-02-16 | Perforation Treatment Performed - Jet Perforation |
2005-07-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-12 | Plug Back Performed |
2005-07-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-24 | Plug Back Performed |
2005-09-17 | Perforation Treatment Performed - Jet Perforation |
2005-09-28 | Perforation Treatment Performed - Fractured |
2005-10-07 | Well Log Performed |
2006-11-09 | Well Began Production |
2006-11-09 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-11-09 | Well Mode changed to Flowing |
2007-09-18 | Well Log Performed |
2008-01-18 | Well Log Performed |
2009-01-21 | Well Log Performed |
2010-01-13 | Well Log Performed |
2011-02-03 | Well Log Performed |
2012-11-16 | Well Log Performed |
2013-11-20 | Well Log Performed |
2014-07-14 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-12-30 | Perforation | 620.50 | 625.50 | 14 |
2005-09-17 | Perforation | 344.70 | 345.00 | 17 |
2005-09-17 | Perforation | 342.70 | 343.00 | 17 |
2005-09-17 | Perforation | 307.00 | 307.80 | 17 |
2005-09-17 | Perforation | 290.40 | 291.00 | 17 |
2005-09-17 | Perforation | 283.80 | 284.80 | 17 |
2005-09-17 | Perforation | 224.60 | 224.90 | 17 |
2005-09-17 | Perforation | 219.30 | 220.40 | 17 |
2005-09-17 | Perforation | 200.60 | 201.30 | 17 |
2005-09-17 | Perforation | 195.70 | 196.40 | 17 |
2005-09-17 | Perforation | 186.00 | 187.30 | 17 |
2005-01-27 | Fracture | 620.50 | 625.50 | 0 |
2005-09-17 | Perforation | 182.80 | 184.60 | 17 |
2005-09-17 | Perforation | 175.70 | 176.50 | 17 |
2005-09-17 | Perforation | 173.80 | 174.20 | 17 |
2005-09-17 | Perforation | 170.80 | 173.10 | 17 |
2005-09-17 | Perforation | 164.20 | 165.90 | 17 |
2005-09-17 | Perforation | 139.80 | 140.10 | 17 |
2005-09-17 | Perforation | 129.00 | 130.90 | 17 |
2005-09-28 | Fracture | 129.00 | 349.00 | 0 |
2005-02-16 | Perforation | 585.50 | 588.00 | 7 |
2005-02-16 | Perforation | 425.50 | 429.50 | 7 |
2005-02-16 | Perforation | 413.00 | 416.00 | 7 |
2005-07-12 | Packing Device Capped w/Cement | 609.00 | 617.00 | 0 |
2005-07-24 | Packing Device Capped w/Cement | 575.00 | 583.00 | 0 |
2005-07-24 | Packing Device Capped w/Cement | 399.70 | 407.70 | 0 |
2005-09-17 | Perforation | 348.50 | 349.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1195 | 0.0 | 0.0 | 0.0 |
2007 | 3395 | 0.0 | 0.0 | 0.0 |
2008 | 8090 | 0.0 | 0.0 | 0.0 |
2009 | 7751 | 0.0 | 0.0 | 0.0 |
2010 | 8457 | 0.0 | 0.0 | 0.0 |
2011 | 8463 | 0.0 | 0.0 | 0.0 |
2012 | 8711 | 0.0 | 0.0 | 0.0 |
2013 | 8735 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8711 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]