X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304241406000

Well Details

Well ID: 0304241406000
Loading map...
Location: 00/06-14-030-24W4/0
Location Alias: 00/06-14-30-24 W4M
Location Alias 2: 00/06-14-030-24 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 14
County/Municipality: Kneehill County
Well Name: ANDEX ET AL TWINING 6-14-30-24
Operator Name: Bumper Development Corporation Ltd.
License Number: 0050884
License Date: 1974-08-19
License Status: RecCertified
Spud Date: 1974-08-24
Final Drill Date: 1974-09-05
Well Total Depth: 1714.50 m
Surface Hole Latitude: 51.565761
Surface Hole Longitude: -113.279288

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-08-19 Obtained License
1974-09-05 Drill Stem Test Performed
1974-09-05 Finished Drilling
1974-09-05 Well Mode changed to Drilled and Cased
1974-09-07 Production Casing Operation Performed
1974-09-22 Perforation Treatment Performed - Jet Perforation
1974-09-23 Perforation Treatment Performed - Acid Wash - No Pressure
1974-09-23 Perforation Treatment Performed - Fractured
1974-10-02 Well Began Production
1974-10-02 Well Fluid changed to Crude Oil
1974-10-02 Well Mode changed to Flowing
1976-07-13 Well Fluid changed to Crude Oil
1976-07-13 Well Mode changed to Pumping
1977-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-27 Plug Back Performed
1990-08-27 Well Abandoned
1990-08-27 Well Fluid changed to Crude Oil
1990-08-27 Well Log Performed
1990-08-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-09-22 Perforation 1655.10 1658.10 3
1990-08-27 Packing Device Capped w/Cement 1640.00 1648.00 0
1974-09-22 Perforation 1668.20 1670.90 3
1974-09-22 Perforation 1672.10 1675.20 3
1974-09-22 Perforation 1678.20 1681.30 3
1974-09-22 Perforation 1682.50 1684.00 3
1974-09-23 Acid Wash 1655.10 1684.00 0
1974-09-23 Fracture 1655.10 1684.00 0
1977-02-27 Acid Treatment 1655.10 1684.00 0
1978-12-15 Acid Treatment 1655.10 1684.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 953 0.0 0.0 0.0
1975 8573 0.0 0.0 0.0
1976 7789 0.0 0.0 0.0
1977 6269 0.0 0.0 0.0
1978 6405 0.0 0.0 0.0
1979 2360 0.0 0.0 0.0
1980 336 0.0 0.0 0.0

For data sources see[5]

References