X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304241410000

Well Details

Well ID: 0304241410000
Loading map...
Location: 00/10-14-030-24W4/0
Location Alias: 00/10-14-30-24 W4M
Location Alias 2: 00/10-14-030-24 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 14
County/Municipality: Kneehill County
Well Name: ANDEX ET AL SWALWELL 10-14-30-24
Operator Name: Bumper Development Corporation Ltd.
License Number: 0046492
License Date: 1973-07-11
License Status: RecCertified
Spud Date: 1973-07-16
Final Drill Date: 1973-07-26
Well Total Depth: 1693.20 m
Surface Hole Latitude: 51.571040
Surface Hole Longitude: -113.271507

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-11 Obtained License
1973-07-26 Finished Drilling
1973-07-26 Well Mode changed to Drilled and Cased
1973-07-27 Drill Stem Test Performed
1973-07-29 Drill Stem Test Performed
1973-07-30 Production Casing Operation Performed
1973-09-05 Perforation Treatment Performed - Jet Perforation
1973-09-21 Well Began Production
1973-09-21 Well Fluid changed to Crude Oil
1973-09-21 Well Mode changed to Flowing
1978-06-02 Well Fluid changed to Crude Oil
1978-06-02 Well Mode changed to Pumping
1981-04-01 Perforation Treatment Performed - Cement Squeeze
1981-04-03 Perforation Treatment Performed - Jet Perforation
1981-04-03 Well Fluid changed to Crude Oil
1981-04-03 Well Mode changed to Abandoned Zone
1990-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-08-22 Plug Back Performed
1990-08-22 Well Abandoned
1990-08-23 Perforation Treatment Performed - Jet Perforation
1990-08-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-09-05 Perforation 1634.90 1636.80 7
1990-08-23 Perforation 224.00 225.00 13
1990-08-28 Remedial Casing Cementing 224.00 225.00 0
1973-09-05 Perforation 1638.00 1639.50 7
1973-09-05 Perforation 1642.90 1643.50 7
1973-09-05 Perforation 1646.20 1651.40 7
1973-09-05 Perforation 1654.50 1656.30 7
1973-09-05 Perforation 1658.70 1659.30 7
1981-04-01 Cement Squeeze 1634.90 1659.30 0
1981-04-03 Perforation 1625.50 1627.60 6
1990-08-22 Packing Device Capped w/Cement 1612.00 1620.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 736 0.0 0.0 0.0
1974 2212 0.0 0.0 0.0
1975 6811 0.0 0.0 0.0
1976 7518 0.0 0.0 0.0
1977 7508 0.0 0.0 0.0
1978 7016 0.0 0.0 0.0
1979 3239 0.0 0.0 0.0
1980 1703 0.0 0.0 0.0

For data sources see[5]

References