X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304242906000

Well Details

Well ID: 0304242906000
Loading map...
Location: 00/06-29-030-24W4/0
Location Alias: 00/06-29-30-24 W4M
Location Alias 2: 00/06-29-030-24 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 24
Section: 29
County/Municipality: Kneehill County
Well Name: ANDEX BUMPER TWINING 6-29-30-24
Operator Name: Bumper Development Corporation Ltd.
License Number: 0086446
License Date: 1980-10-20
License Status: RecCertified
Spud Date: 1980-11-18
Final Drill Date: 1980-11-28
Well Total Depth: 1758.00 m
Surface Hole Latitude: 51.597534
Surface Hole Longitude: -113.346137

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-20 Obtained License
1980-11-24 Drill Stem Test Performed
1980-11-28 Finished Drilling
1980-11-28 Well Log Performed
1980-11-28 Well Mode changed to Drilled and Cased
1980-11-29 Drill Stem Test Performed
1980-12-01 Production Casing Operation Performed
1981-01-29 Perforation Treatment Performed - Jet Perforation
1981-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-03 Well Began Production
1981-03-03 Well Fluid changed to Crude Oil
1981-03-03 Well Mode changed to Pumping
1982-06-01 Well Fluid changed to Crude Oil
1982-06-01 Well Mode changed to Suspended
1986-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-11-04 Plug Back Performed
1986-11-04 Well Log Performed
1986-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-11-06 Plug Back Performed
1986-11-06 Well Abandoned
1986-11-06 Well Fluid changed to Crude Oil
1986-11-06 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-01-29 Perforation 1700.30 1700.70 6
1981-01-29 Perforation 1701.80 1706.00 6
1981-01-29 Perforation 1707.20 1710.00 6
1981-01-30 Acid Treatment 1700.30 1710.00 0
1986-11-04 Packing Device Capped w/Cement 1684.00 1698.00 0
1986-11-06 Packing Device Capped w/Cement 857.00 865.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1043 0.0 0.0 0.0

For data sources see[5]

References