X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304281010000

Well Details

Well ID: 0304281010000
Loading map...
Location: 00/10-10-030-28W4/0
Location Alias: 00/10-10-30-28 W4M
Location Alias 2: 00/10-10-030-28 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 28
Section: 10
County/Municipality: Mountain View County
Well Name: PWEI UNIT #3 LPINECK 10-10-30-28
Operator Name: TAQA North Ltd.
License Number: 0031448
License Date: 1966-12-13
License Status: Abandoned
Spud Date: 1967-01-08
Final Drill Date: 1967-01-29
Well Total Depth: 2457.30 m
Surface Hole Latitude: 51.555923
Surface Hole Longitude: -113.858138

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-12-13 Obtained License
1967-01-29 Finished Drilling
1967-01-29 Well Log Performed
1967-01-30 Production Casing Operation Performed
1967-02-01 Perforation Treatment Performed - Jet Perforation
1967-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-07-21 Well Mode changed to Drilled and Cased
1969-01-13 Well Began Production
1969-01-13 Well Fluid changed to Gas
1969-01-13 Well Mode changed to Flowing
1992-09-14 Well Log Performed
1992-09-18 Perforation Treatment Performed - Condensate Squeeze
1996-03-10 Perforation Treatment Performed - Jet Perforation
1996-03-10 Well Log Performed
1996-03-18 Perforation Treatment Performed - Remedial Casing
2010-12-21 Well Log Performed
2010-12-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-23 Plug Back Performed
2010-12-23 Well Fluid changed to Gas
2010-12-23 Well Mode changed to Abandoned Zone
2011-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-06 Perforation Treatment Performed - Jet Perforation
2011-01-06 Well Log Performed
2011-01-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-10 Perforation Treatment Performed - Cement Squeeze
2011-01-11 Perforation Treatment Performed - Jet Perforation
2011-01-11 Well Log Performed
2011-01-12 Perforation Treatment Performed - Cement Squeeze
2011-01-16 Perforation Treatment Performed - Jet Perforation
2011-01-16 Well Log Performed
2011-01-17 Perforation Treatment Performed - Cement Plug
2011-01-17 Perforation Treatment Performed - Cement Squeeze
2011-01-19 Perforation Treatment Performed - Jet Perforation
2011-01-19 Well Log Performed
2011-01-20 Perforation Treatment Performed - Cement Plug
2011-01-20 Perforation Treatment Performed - Cement Squeeze
2011-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-21 Perforation Treatment Performed - Jet Perforation
2011-01-21 Well Log Performed
2011-01-22 Perforation Treatment Performed - Jet Perforation
2011-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-24 Perforation Treatment Performed - Jet Perforation
2011-01-24 Well Log Performed
2011-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-25 Perforation Treatment Performed - Cement Squeeze
2011-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-01-26 Perforation Treatment Performed - Jet Perforation
2011-01-26 Well Log Performed
2011-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-03 Perforation Treatment Performed - Cement Squeeze
2011-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-04 Perforation Treatment Performed - Jet Perforation
2011-02-04 Well Log Performed
2011-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-06 Perforation Treatment Performed - Cement Squeeze
2011-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-07 Perforation Treatment Performed - Jet Perforation
2011-02-07 Well Log Performed
2011-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-09 Perforation Treatment Performed - Cement Squeeze
2011-05-02 Well Abandoned
2011-05-02 Well Fluid changed to Gas
2011-05-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-02-01 Perforation 2420.70 2434.70 7
2011-01-10 Cement Squeeze 1854.00 1855.00 0
2011-01-10 Packing Device Capped w/Cement 1840.00 1849.00 0
2011-01-11 Perforation 1790.00 1791.00 17
2011-01-12 Cement Squeeze 1780.00 1781.00 0
2011-01-16 Perforation 1809.00 1810.00 17
2011-01-16 Perforation 1775.00 1776.00 17
2011-01-16 Perforation 1675.00 1676.00 17
2011-01-16 Perforation 1600.00 1601.00 17
2011-01-17 Cement Squeeze 1809.00 1810.00 0
2011-01-17 Cement Squeeze 1775.00 1776.00 0
1967-02-20 Acid Treatment 2420.70 2434.70 0
2011-01-17 Cement Squeeze 1675.00 1676.00 0
2011-01-17 Cement Squeeze 1600.00 1601.00 0
2011-01-17 Cement Plug 1549.20 1821.00 0
2011-01-19 Perforation 1358.00 1359.00 17
2011-01-19 Perforation 1196.00 1197.00 17
2011-01-20 Cement Squeeze 1358.00 1359.00 0
2011-01-20 Cement Squeeze 1196.00 1197.00 0
2011-01-20 Cement Plug 1328.50 1548.00 0
2011-01-21 Packing Device Capped w/Cement 1197.00 1201.00 0
2011-01-21 Perforation 1196.00 1197.00 17
1992-09-18 Condensate Squeeze 2420.70 2434.70 0
2011-01-22 Perforation 1050.00 1051.00 17
2011-01-23 Packing Device Capped w/Cement 1181.00 1192.00 0
2011-01-24 Packing Device Capped w/Cement 1041.00 1048.00 0
2011-01-24 Perforation 1040.00 1041.00 17
2011-01-24 Perforation 902.00 903.00 17
2011-01-25 Cement Squeeze 1040.00 1041.00 0
2011-01-25 Packing Device Capped w/Cement 1025.00 1033.00 0
2011-01-26 Packing Device Capped w/Cement 893.00 900.00 0
2011-01-26 Perforation 892.00 893.00 17
2011-01-26 Perforation 751.00 752.00 17
1996-03-10 Perforation 425.00 425.00 14
2011-01-26 Perforation 610.00 611.00 17
2011-02-03 Cement Squeeze 892.00 893.00 0
2011-02-03 Packing Device Capped w/Cement 880.00 888.00 0
2011-02-04 Packing Device Capped w/Cement 740.00 748.00 0
2011-02-04 Perforation 730.00 731.00 17
2011-02-06 Cement Squeeze 730.00 731.00 0
2011-02-06 Packing Device Capped w/Cement 718.00 726.00 0
2011-02-07 Packing Device Capped w/Cement 598.00 606.00 0
2011-02-07 Perforation 365.00 366.00 17
2011-02-07 Packing Device Capped w/Cement 366.00 370.00 0
1996-03-18 Remedial Casing Cementing 425.00 425.00 0
2011-02-09 Cement Squeeze 365.00 366.00 0
2011-02-09 Packing Device Capped w/Cement 351.00 360.00 0
2010-12-23 Packing Device Capped w/Cement 2387.00 2395.00 0
2011-01-06 Packing Device Capped w/Cement 1855.00 1861.00 0
2011-01-06 Perforation 1854.00 1855.00 17
2011-01-06 Perforation 1780.00 1781.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1969 5067 0.0 0.0 0.0
1970 4380 0.0 0.0 0.0
1971 3560 0.0 0.0 0.0
1972 2897 0.0 0.0 0.0
1973 8095 0.0 0.0 0.0
1974 8113 0.0 0.0 0.0
1975 7411 0.0 0.0 0.0
1976 6753 0.0 0.0 0.0
1977 7539 0.0 0.0 0.0
1978 3016 0.0 0.0 0.0
1979 3393 0.0 0.0 0.0
1980 151 0.0 0.0 0.0
1981 186 0.0 0.0 0.0
1984 434 0.0 0.0 0.0
1986 3879 0.0 0.0 0.0
1987 7974 0.0 0.0 0.0
1988 8396 0.0 0.0 0.0
1989 8562 0.0 0.0 0.0
1990 6445 0.0 0.0 0.0
1991 979 0.0 0.0 0.0
1992 2668 0.0 0.0 0.0
1993 8448 0.0 0.0 0.0
1994 8611 0.0 0.0 0.0
1995 8020 0.0 0.0 0.0
1996 7580 0.0 0.0 0.0
1997 4724 0.0 0.0 0.0
1998 8508 0.0 0.0 0.0
1999 8252 0.0 0.0 0.0
2000 6823 0.0 0.0 0.0
2001 201 0.0 0.0 0.0
2003 4168 0.0 0.0 0.0
2004 8782 0.0 0.0 0.0
2005 8688 0.0 0.0 0.0
2006 7677 0.0 0.0 0.0
2007 1774 0.0 0.0 0.0

For data sources see[5]

References