X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305101605000

Well Details

Well ID: 0305101605000
Loading map...
Location: 00/05-16-030-10W5/0
Location Alias: 00/05-16-30-10 W5M
Location Alias 2: 00/05-16-030-10 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 10
Section: 16
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin PANTHER 5-16-30-10
Operator Name: Canlin Energy Corporation
License Number: 0330544
License Date: 2005-05-06
License Status: Amended
Spud Date: 2005-08-12
Final Drill Date: 2006-02-05
Well Total Depth: 6917.00 m
Surface Hole Latitude: 51.583859
Surface Hole Longitude: -115.387467

For data sources see[1][2]

Well History

Date Event
2005-05-06 Obtained License
2005-08-23 Surface Casing Operation Performed
2005-09-21 Well Log Performed
2005-10-25 Intermediate Casing Operation Performed
2005-10-31 Direction Drilling Operation Performed - Deviate
2005-11-28 Well Log Performed
2005-12-15 Well Log Performed
2005-12-18 Liner Casing Operation Performed
2005-12-24 Direction Drilling Operation Performed - Horizontal
2006-01-23 Well Log Performed
2006-02-05 Finished Drilling
2006-02-05 Well Log Performed
2006-02-05 Well Mode changed to Drilled and Cased
2006-02-09 Well Log Performed
2006-02-17 Rig Released
2006-02-27 Perforation Treatment Performed - Open-Hole Completion
2006-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-03-13 Well Began Production
2006-03-13 Well Fluid changed to Gas
2006-03-13 Well Mode changed to Pumping
2006-04-01 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-10-31 3399.00 Deviate (5 - 79 degrees)
2005-12-24 4907.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-27 Open Hole/Barefoot Completion 4811.00 6917.00 0
2006-03-06 Acid Treatment 4811.00 6917.00 0
2006-04-01 Chemical Squeeze 4811.00 6917.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5320 0.0 0.0 0.0
2007 8588 0.0 0.0 0.0
2008 8704 0.0 0.0 0.0
2009 8725 0.0 0.0 0.0
2010 7198 0.0 0.0 0.0
2011 7644 0.0 0.0 0.0
2012 8492 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8554 0.0 0.0 0.0
2015 8454 0.0 0.0 0.0
2016 6239 0.0 0.0 0.0
2017 8544 0.0 0.0 0.0
2018 6503 0.0 0.0 0.0
2019 5063 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References