X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0305101905000

Well Details

Well ID: 0305101905000
Loading map...
Location: 00/05-19-030-10W5/0
Location Alias: 00/05-19-30-10 W5M
Location Alias 2: 00/05-19-030-10 W5/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 5
Range: 10
Section: 19
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin PANTHER 5-19-30-10
Operator Name: Canlin Energy Corporation
License Number: 0013570
License Date: 1957-06-19
License Status: Issued
Spud Date: 1957-06-27
Final Drill Date: 1958-07-18
Well Total Depth: 4088.60 m
Surface Hole Latitude: 51.582395
Surface Hole Longitude: -115.404059

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-06-19 Obtained License
1957-12-10 Drill Stem Test Performed
1957-12-11 Drill Stem Test Performed
1957-12-22 Drill Stem Test Performed
1958-01-22 Drill Stem Test Performed
1958-02-12 Lost Circulation Occurred
1958-06-11 Liner Casing Operation Performed
1958-07-18 Finished Drilling
1958-07-22 Drill Stem Test Performed
1958-08-08 Perforation Treatment Performed - Open-Hole Completion
1958-08-13 Perforation Treatment Performed - Acid Wash - No Pressure
1958-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1958-09-15 Perforation Treatment Performed - Bullet Perforation
1958-10-13 Well Mode changed to Drilled and Cased
1960-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-18 Perforation Treatment Performed - Fractured
1986-08-15 Perforation Treatment Performed - Jet Perforation
1986-08-16 Well Log Performed
1986-09-18 Perforation Treatment Performed - Jet Perforation
1986-09-19 Perforation Treatment Performed - Cement Squeeze
1986-09-19 Plug Back Performed
1986-09-24 Perforation Treatment Performed - Open-Hole Completion
1986-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-29 Perforation Treatment Performed - Fractured
1989-07-14 Well Began Production
1989-07-14 Well Fluid changed to Gas
1989-07-14 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-08-08 Open Hole/Barefoot Completion 3871.30 4088.60 0
1958-09-15 Bullet Perforation 3073.00 3075.40 3
1958-09-15 Bullet Perforation 3078.50 3081.50 3
1958-09-15 Bullet Perforation 3084.00 3085.20 3
1958-09-15 Bullet Perforation 3102.90 3104.70 3
1958-09-15 Bullet Perforation 3121.20 3124.20 3
1958-09-15 Bullet Perforation 3127.20 3128.50 3
1958-09-15 Bullet Perforation 3131.50 3136.40 3
1958-09-15 Bullet Perforation 3146.10 3157.10 3
1958-09-15 Bullet Perforation 3160.80 3165.00 3
1958-09-15 Bullet Perforation 3204.10 3215.60 3
1958-08-13 Acid Wash 3871.30 4088.60 0
1958-09-15 Bullet Perforation 2748.10 2753.60 3
1958-09-15 Bullet Perforation 2759.00 2762.70 3
1958-09-15 Bullet Perforation 2769.40 2796.80 3
1958-09-15 Bullet Perforation 2799.90 2806.00 3
1958-09-15 Bullet Perforation 2816.70 2823.70 3
1958-09-15 Bullet Perforation 2844.10 2846.20 3
1958-09-15 Bullet Perforation 2857.20 2859.00 3
1958-09-15 Bullet Perforation 2886.50 2888.30 3
1958-09-15 Bullet Perforation 2890.70 2895.00 3
1958-09-15 Bullet Perforation 2898.60 2901.10 3
1958-08-15 Acid Treatment 3871.30 4088.60 0
1958-09-15 Bullet Perforation 2907.20 2910.20 3
1958-09-15 Bullet Perforation 2911.40 2913.90 3
1958-09-15 Bullet Perforation 2916.90 2918.20 3
1958-09-15 Bullet Perforation 2931.00 2932.80 3
1958-09-15 Bullet Perforation 2944.40 2947.40 3
1958-09-15 Bullet Perforation 2953.50 2956.60 3
1958-09-15 Bullet Perforation 2973.60 2976.10 3
1960-10-02 Acid Treatment 2746.20 3215.60 0
1960-10-09 Acid Treatment 2746.20 3215.60 0
1960-11-18 Acid Treatment 2746.20 3215.60 0
1958-08-19 Acid Treatment 3871.30 4088.60 0
1960-11-18 Fracture 2746.20 3215.60 0
1986-08-15 Perforation 2720.00 2720.30 3
1986-09-18 Perforation 3317.00 3317.50 16
1986-09-19 Cement Squeeze 2720.00 3215.60 0
1986-09-24 Open Hole/Barefoot Completion 3871.30 4088.00 0
1986-09-28 Acid Treatment 3871.30 4088.00 0
1986-09-29 Fracture 3871.30 4088.00 0
1958-08-29 Acid Treatment 3871.30 4088.60 0
1958-09-14 Packing Device Capped w/Cement 3215.60 3215.60 0
1958-09-15 Bullet Perforation 3029.70 3032.80 3
1958-09-15 Bullet Perforation 3062.60 3063.80 3
1958-09-15 Bullet Perforation 3068.10 3070.60 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1989 3201 0.0 0.0 0.0
1990 8611 0.0 0.0 0.0
1991 7557 0.0 0.0 0.0
1992 8755 0.0 0.0 0.0
1993 8733 0.0 0.0 0.0
1994 8390 0.0 0.0 0.0
1995 8733 0.0 0.0 0.0
1996 8703 0.0 0.0 0.0
1997 7499 0.0 0.0 0.0
1998 8720 0.0 0.0 0.0
1999 8734 0.0 0.0 0.0
2000 8704 0.0 0.0 0.0
2001 8409 0.0 0.0 0.0
2002 8603 0.0 0.0 0.0
2003 8652 0.0 0.0 0.0
2004 7601 0.0 0.0 0.0
2005 7371 0.0 0.0 0.0
2006 6150 0.0 0.0 0.0
2007 8208 0.0 0.0 0.0
2008 8572 0.0 0.0 0.0
2009 8638 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8255 0.0 0.0 0.0
2012 8722 0.0 0.0 0.0
2013 8692 0.0 0.0 0.0
2014 8503 0.0 0.0 0.0
2015 8110 0.0 0.0 0.0
2016 8456 0.0 0.0 0.0
2017 8741 0.0 0.0 0.0
2018 7775 0.0 0.0 0.0
2019 6527 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1958-02-12 Lost Circulation 2793.80 2835.80

For data sources see[6]

References