If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314010114020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.632007,"lon":-110.032025,"icon":""}]} |
Location: 02/14-01-031-01W4/0 | |
Location Alias: 02/14-01-31-01 W4M | |
Location Alias 2: 02/14-01-031-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 01 | |
Section: 01 | |
County/Municipality: Special Areas No. 3 | |
Well Name: KALLISTO ESTHER 14-1-31-1 | |
Operator Name: Steelhead Petroleum Ltd. | |
License Number: 0435412 | |
License Date: 2011-07-23 | |
License Status: Suspension | |
Spud Date: 2011-09-07 | |
Final Drill Date: 2011-09-12 | |
Well Total Depth: 1627.00 m | |
Surface Hole Latitude: 51.632007 | |
Surface Hole Longitude: -110.032025 |
Date | Event |
---|---|
2011-07-23 | Obtained License |
2011-09-07 | Surface Casing Operation Performed |
2011-09-11 | Direction Drilling Operation Performed - Horizontal |
2011-09-12 | Finished Drilling |
2011-09-12 | Well Mode changed to Drilled and Cased |
2011-09-13 | Production Casing Operation Performed |
2011-09-13 | Rig Released |
2011-09-16 | Well Log Performed |
2011-09-18 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2011-09-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-07 | Well Began Production |
2011-10-07 | Well Fluid changed to Crude Oil |
2011-10-07 | Well Mode changed to Pumping |
2018-12-01 | Well Fluid changed to Crude Oil |
2018-12-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-11 | 552.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-18 | Hydra Jet Perforation | 1605.00 | 1605.50 | 0 |
2011-09-18 | Multi-Stage Fracture | 1066.20 | 1068.80 | 0 |
2011-09-18 | Multi-Stage Fracture | 1006.10 | 1008.70 | 0 |
2011-09-18 | Multi-Stage Fracture | 946.00 | 948.60 | 0 |
2011-09-18 | Multi-Stage Fracture | 1537.40 | 1540.10 | 0 |
2011-09-18 | Multi-Stage Fracture | 1479.70 | 1482.40 | 0 |
2011-09-18 | Multi-Stage Fracture | 1422.10 | 1424.80 | 0 |
2011-09-18 | Multi-Stage Fracture | 1364.60 | 1367.30 | 0 |
2011-09-18 | Multi-Stage Fracture | 1306.20 | 1308.90 | 0 |
2011-09-18 | Multi-Stage Fracture | 1246.30 | 1248.90 | 0 |
2011-09-18 | Multi-Stage Fracture | 1186.00 | 1188.60 | 0 |
2011-09-18 | Multi-Stage Fracture | 1126.00 | 1128.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1875 | 0.0 | 0.0 | 0.0 |
2012 | 8556 | 0.0 | 0.0 | 0.0 |
2013 | 8639 | 0.0 | 0.0 | 0.0 |
2014 | 8719 | 0.0 | 0.0 | 0.0 |
2015 | 5496 | 0.0 | 0.0 | 0.0 |
2016 | 4680 | 0.0 | 0.0 | 0.0 |
2017 | 4648 | 0.0 | 0.0 | 0.0 |
For data sources see[6]