If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314090906000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.639318,"lon":-111.225654,"icon":""}]} |
Location: 00/06-09-031-09W4/0 | |
Location Alias: 00/06-09-31-09 W4M | |
Location Alias 2: 00/06-09-031-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 09 | |
Section: 09 | |
County/Municipality: Special Areas No. 3 | |
Well Name: SOC SOUND 6-9-31-9 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0072633 | |
License Date: 1978-10-26 | |
License Status: Issued | |
Spud Date: 1978-12-07 | |
Final Drill Date: 1978-12-17 | |
Well Total Depth: 1180.00 m | |
Surface Hole Latitude: 51.639318 | |
Surface Hole Longitude: -111.225654 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-10-26 | Obtained License |
1978-12-17 | Finished Drilling |
1978-12-20 | Production Casing Operation Performed |
1979-01-09 | Perforation Treatment Performed - Jet Perforation |
1979-01-10 | Perforation Treatment Performed - Acid Wash - No Pressure |
1979-02-20 | Perforation Treatment Performed - Cement Squeeze |
1979-02-22 | Perforation Treatment Performed - Jet Perforation |
1979-03-18 | Well Mode changed to Drilled and Cased |
1993-10-01 | Well Fluid changed to Crude Oil |
1993-10-01 | Well Mode changed to Potential |
1993-10-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-10-02 | Plug Back Performed |
1993-10-02 | Well Fluid changed to Crude Oil |
1993-10-02 | Well Mode changed to Abandoned Zone |
1993-10-03 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-01-09 | Perforation | 1125.50 | 1126.80 | 7 |
1979-01-10 | Acid Wash | 1125.50 | 1126.80 | 0 |
1979-02-20 | Cement Squeeze | 1125.50 | 1126.80 | 0 |
1979-02-22 | Perforation | 1125.50 | 1126.80 | 7 |
1993-10-02 | Packing Device Capped w/Cement | 1102.00 | 1110.00 | 0 |
1993-10-03 | Perforation | 870.00 | 872.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 648 | 0.0 | 0.0 | 0.0 |
For data sources see[5]