X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314161916000

Well Details

Well ID: 0314161916000
Loading map...
Location: 00/16-19-031-16W4/0
Location Alias: 00/16-19-31-16 W4M
Location Alias 2: 00/16-19-031-16 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 16
Section: 19
County/Municipality: Starland County
Well Name: DEML CRAIGML 16-19-31-16
Operator Name: Direct Energy Marketing Limited
License Number: 0120676
License Date: 1985-12-23
License Status: RecCertified
Spud Date: 1986-01-08
Final Drill Date: 1986-01-12
Well Total Depth: 1373.00 m
Surface Hole Latitude: 51.675105
Surface Hole Longitude: -112.254076

For data sources see[1][2]

Well History

Date Event
1985-12-23 Obtained License
1986-01-09 Surface Casing Operation Performed
1986-01-12 Finished Drilling
1986-01-12 Well Log Performed
1986-01-14 Production Casing Operation Performed
1986-01-14 Rig Released
1986-01-17 Perforation Treatment Performed - Jet Perforation
1986-01-17 Well Log Performed
1986-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-19 Perforation Treatment Performed - Jet Perforation
1986-01-19 Well Log Performed
1986-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-21 Perforation Treatment Performed - Jet Perforation
1986-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-01-25 Well Mode changed to Drilled and Cased
1988-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-11 Perforation Treatment Performed - Jet Perforation
1988-05-11 Plug Back Performed
1988-05-11 Well Mode changed to Abandoned Zone
1988-05-12 Perforation Treatment Performed - Cement Squeeze
1988-05-13 Perforation Treatment Performed - Jet Perforation
1990-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-01-25 Plug Back Performed
1990-01-26 Perforation Treatment Performed - Jet Perforation
1990-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-17 Perforation 1300.50 1301.50 13
1988-05-12 Cement Squeeze 330.00 331.00 0
1988-05-13 Perforation 321.00 324.00 13
1990-01-25 Packing Device Capped w/Cement 312.00 320.00 0
1990-01-26 Perforation 225.00 226.00 13
1990-01-26 Perforation 274.00 275.00 13
1990-01-30 Packing Device Capped w/Cement 262.00 270.00 0
1990-01-30 Packing Device Capped w/Cement 212.00 220.00 0
1986-01-18 Acid Treatment 1300.50 1301.50 0
1986-01-19 Perforation 1295.00 1298.00 13
1986-01-20 Acid Treatment 1295.00 1298.00 0
1986-01-21 Perforation 1290.00 1292.50 13
1986-01-22 Acid Treatment 1290.00 1292.50 0
1986-01-24 Acid Treatment 1290.00 1292.50 0
1988-05-11 Packing Device Capped w/Cement 1277.00 1285.00 0
1988-05-11 Perforation 330.00 331.00 13

For data sources see[4]



References