If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314172816000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.689335,"lon":-112.349307,"icon":""}]} |
Location: 00/16-28-031-17W4/0 | |
Location Alias: 00/16-28-31-17 W4M | |
Location Alias 2: 00/16-28-031-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 17 | |
Section: 28 | |
County/Municipality: Starland County | |
Well Name: DEML MICHI 16-28-31-17 | |
Operator Name: Direct Energy Marketing Limited | |
License Number: 0119663 | |
License Date: 1985-11-25 | |
License Status: RecCertified | |
Spud Date: 1986-01-28 | |
Final Drill Date: 1986-02-04 | |
Well Total Depth: 1380.00 m | |
Surface Hole Latitude: 51.689335 | |
Surface Hole Longitude: -112.349307 |
Date | Event |
---|---|
1985-11-25 | Obtained License |
1986-01-29 | Surface Casing Operation Performed |
1986-02-04 | Finished Drilling |
1986-02-04 | Well Log Performed |
1986-02-05 | Production Casing Operation Performed |
1986-02-05 | Rig Released |
1986-02-05 | Well Mode changed to Drilled and Cased |
1986-02-15 | Well Log Performed |
1986-03-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-21 | Perforation Treatment Performed - Jet Perforation |
1986-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-22 | Perforation Treatment Performed - Jet Perforation |
1986-03-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-03-24 | Perforation Treatment Performed - Jet Perforation |
1986-03-24 | Plug Back Performed |
1986-09-22 | Perforation Treatment Performed - Jet Perforation |
1986-09-24 | Perforation Treatment Performed - Jet Perforation |
1986-10-06 | Perforation Treatment Performed - Fractured |
1986-10-06 | Perforation Treatment Performed - Jet Perforation |
1986-10-09 | Perforation Treatment Performed - Cement Squeeze |
1986-10-09 | Plug Back Performed |
1986-10-10 | Perforation Treatment Performed - Jet Perforation |
1986-10-14 | Perforation Treatment Performed - Fractured |
1986-10-18 | Well Began Production |
1986-10-18 | Well Fluid changed to Gas |
1986-10-18 | Well Mode changed to Flowing |
1988-06-14 | Perforation Treatment Performed - Jet Perforation |
1989-05-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-05-08 | Plug Back Performed |
1989-05-08 | Well Abandoned |
1989-05-08 | Well Fluid changed to Gas |
1989-05-08 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-03-21 | Perforation | 1307.00 | 1308.50 | 13 |
1986-10-06 | Perforation | 1330.00 | 1332.00 | 13 |
1986-10-06 | Fracture | 1299.00 | 1332.00 | 0 |
1986-10-09 | Cement Squeeze | 1286.50 | 1332.00 | 0 |
1986-10-10 | Perforation | 1286.50 | 1289.00 | 13 |
1986-10-14 | Fracture | 1286.50 | 1289.00 | 0 |
1988-06-14 | Perforation | 1275.00 | 1276.50 | 13 |
1988-06-14 | Perforation | 1291.10 | 1292.10 | 13 |
1989-05-08 | Packing Device Capped w/Cement | 1262.00 | 1270.00 | 0 |
1986-03-21 | Acid Treatment | 1307.00 | 1308.50 | 0 |
1986-03-22 | Perforation | 1299.00 | 1301.00 | 13 |
1986-03-22 | Acid Treatment | 1299.00 | 1301.00 | 0 |
1986-03-23 | Acid Treatment | 1299.00 | 1301.00 | 0 |
1986-03-24 | Packing Device Capped w/Cement | 1294.50 | 1297.50 | 0 |
1986-03-24 | Perforation | 1286.50 | 1289.00 | 13 |
1986-09-22 | Perforation | 1299.00 | 1301.00 | 13 |
1986-09-24 | Perforation | 1307.00 | 1308.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 1198 | 0.0 | 0.0 | 0.0 |
1987 | 8270 | 0.0 | 0.0 | 0.0 |
1988 | 2841 | 0.0 | 0.0 | 0.0 |
1989 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]