X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0314240716000

Well Details

Well ID: 0314240716000
Loading map...
Location: 00/16-07-031-24W4/0
Location Alias: 00/16-07-31-24 W4M
Location Alias 2: 00/16-07-031-24 W4/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 4
Range: 24
Section: 07
County/Municipality: Kneehill County
Well Name: ANDEX BUMPER TWINING 16-7-31-24
Operator Name: Bumper Development Corporation Ltd.
License Number: 0083144
License Date: 1980-05-30
License Status: RecCertified
Spud Date: 1980-07-01
Final Drill Date: 1980-07-10
Well Total Depth: 1740.00 m
Surface Hole Latitude: 51.645562
Surface Hole Longitude: -113.388083

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-30 Obtained License
1980-07-07 Drill Stem Test Performed
1980-07-10 Finished Drilling
1980-07-10 Well Log Performed
1980-07-10 Well Mode changed to Drilled and Cased
1980-07-12 Drill Stem Test Performed
1980-07-13 Production Casing Operation Performed
1980-08-08 Perforation Treatment Performed - Jet Perforation
1980-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-13 Perforation Treatment Performed - Cement Squeeze
1980-08-14 Perforation Treatment Performed - Jet Perforation
1980-08-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-08-15 Well Began Production
1980-08-15 Well Fluid changed to Crude Oil
1980-08-15 Well Mode changed to Flowing
1983-08-30 Well Fluid changed to Crude Oil
1983-08-30 Well Mode changed to Suspended
1990-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-07-31 Plug Back Performed
1990-07-31 Well Fluid changed to Crude Oil
1990-07-31 Well Log Performed
1990-07-31 Well Mode changed to Abandoned
1990-08-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-08-08 Perforation 1714.00 1715.00 6
1980-08-14 Perforation 1701.30 1706.50 6
1980-08-15 Acid Treatment 1692.30 1706.50 0
1990-07-31 Packing Device Capped w/Cement 1678.00 1686.00 0
1980-08-08 Perforation 1716.50 1718.30 6
1980-08-08 Perforation 1721.00 1724.00 6
1980-08-08 Perforation 1726.00 1728.00 6
1980-08-08 Perforation 1728.80 1731.30 6
1980-08-09 Acid Treatment 1714.00 1731.30 0
1980-08-13 Cement Squeeze 1714.00 1731.30 0
1980-08-14 Perforation 1692.30 1693.00 6
1980-08-14 Perforation 1696.20 1700.00 6

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1464 0.0 0.0 0.0
1981 648 0.0 0.0 0.0
1982 2965 0.0 0.0 0.0
1983 808 0.0 0.0 0.0

For data sources see[5]

References