If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0314243103000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.69389,"lon":-113.383937,"icon":""}]} |
Location: 00/03-31-031-24W4/0 | |
Location Alias: 00/03-31-31-24 W4M | |
Location Alias 2: 00/03-31-031-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 031 | |
Meridian: 4 | |
Range: 24 | |
Section: 31 | |
County/Municipality: Kneehill County | |
Well Name: BARNWELL HZ TWINING 3-31-31-24 | |
Operator Name: Barnwell of Canada, Limited | |
License Number: 0456926 | |
License Date: 2013-05-13 | |
License Status: Issued | |
Spud Date: 2013-05-23 | |
Final Drill Date: 2013-06-04 | |
Well Total Depth: 2685.00 m | |
Surface Hole Latitude: 51.693890 | |
Surface Hole Longitude: -113.383937 |
Date | Event |
---|---|
2013-05-13 | Obtained License |
2013-05-24 | Surface Casing Operation Performed |
2013-05-26 | Direction Drilling Operation Performed - Deviate |
2013-05-30 | Direction Drilling Operation Performed - Horizontal |
2013-05-31 | Intermediate Casing Operation Performed |
2013-06-04 | Finished Drilling |
2013-06-04 | Well Log Performed |
2013-06-04 | Well Mode changed to Drilled and Cased |
2013-06-06 | Rig Released |
2013-06-08 | Perforation Treatment Performed - Cement Plug |
2013-06-27 | Well Log Performed |
2013-08-05 | Liner Casing Operation Performed |
2013-08-19 | Well Log Performed |
2013-08-21 | Perforation Treatment Performed - Jet Perforation |
2013-08-22 | Well Log Performed |
2013-08-27 | Perforation Treatment Performed - Jet Perforation |
2013-08-27 | Well Log Performed |
2013-08-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-08-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-09-16 | Well Began Production |
2013-09-16 | Well Fluid changed to Crude Oil |
2013-09-16 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-05-23 | Chinook Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-05-26 | 1478.50 | Deviate (5 - 79 degrees) |
2013-05-30 | 1759.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-06-08 | Cement Plug | 2439.00 | 2685.00 | 0 |
2013-08-21 | Perforation | 2370.00 | 2370.50 | 17 |
2013-08-21 | Perforation | 2360.00 | 2360.50 | 17 |
2013-08-21 | Perforation | 2345.00 | 2345.50 | 17 |
2013-08-21 | Perforation | 2331.00 | 2331.50 | 17 |
2013-08-21 | Perforation | 2317.00 | 2317.50 | 17 |
2013-08-21 | Perforation | 2305.00 | 2305.50 | 17 |
2013-08-21 | Perforation | 2294.00 | 2294.50 | 17 |
2013-08-21 | Perforation | 2284.00 | 2284.50 | 17 |
2013-08-21 | Perforation | 2274.00 | 2274.50 | 17 |
2013-08-27 | Perforation | 2260.00 | 2260.50 | 17 |
2013-08-21 | Perforation | 2437.00 | 2437.50 | 17 |
2013-08-27 | Perforation | 2246.00 | 2246.50 | 17 |
2013-08-27 | Perforation | 2229.00 | 2229.50 | 17 |
2013-08-27 | Perforation | 2209.00 | 2209.50 | 17 |
2013-08-27 | Perforation | 2199.00 | 2199.50 | 17 |
2013-08-27 | Perforation | 2186.00 | 2186.50 | 17 |
2013-08-27 | Perforation | 2173.00 | 2173.50 | 17 |
2013-08-27 | Perforation | 2163.00 | 2163.50 | 17 |
2013-08-27 | Perforation | 2153.00 | 2153.50 | 17 |
2013-08-27 | Perforation | 2140.00 | 2140.50 | 17 |
2013-08-27 | Perforation | 2130.00 | 2130.50 | 17 |
2013-08-21 | Perforation | 2429.00 | 2429.50 | 17 |
2013-08-27 | Perforation | 2115.00 | 2115.50 | 17 |
2013-08-27 | Perforation | 2103.00 | 2103.50 | 17 |
2013-08-27 | Perforation | 2089.00 | 2089.50 | 17 |
2013-08-27 | Perforation | 2076.00 | 2076.50 | 17 |
2013-08-27 | Perforation | 2063.00 | 2063.50 | 17 |
2013-08-27 | Perforation | 2052.00 | 2052.50 | 17 |
2013-08-28 | Acid Treatment | 2347.00 | 2347.50 | 0 |
2013-08-28 | Acid Treatment | 2429.00 | 2429.50 | 0 |
2013-08-28 | Acid Treatment | 2422.00 | 2422.50 | 0 |
2013-08-28 | Acid Treatment | 2415.00 | 2415.50 | 0 |
2013-08-21 | Perforation | 2422.00 | 2422.50 | 17 |
2013-08-28 | Acid Treatment | 2409.00 | 2409.50 | 0 |
2013-08-28 | Acid Treatment | 2397.00 | 2397.50 | 0 |
2013-08-29 | Acid Treatment | 2386.00 | 2386.50 | 0 |
2013-08-29 | Acid Treatment | 2377.00 | 2377.50 | 0 |
2013-08-29 | Acid Treatment | 2370.00 | 2370.50 | 0 |
2013-08-29 | Acid Treatment | 2360.00 | 2360.50 | 0 |
2013-08-29 | Acid Treatment | 2345.00 | 2345.50 | 0 |
2013-08-29 | Acid Treatment | 2331.00 | 2331.50 | 0 |
2013-08-29 | Acid Treatment | 2317.00 | 2317.50 | 0 |
2013-08-29 | Acid Treatment | 2305.00 | 2305.50 | 0 |
2013-08-21 | Perforation | 2415.00 | 2415.50 | 17 |
2013-08-29 | Acid Treatment | 2294.00 | 2294.50 | 0 |
2013-08-29 | Acid Treatment | 2284.00 | 2284.50 | 0 |
2013-08-29 | Acid Treatment | 2274.00 | 2274.50 | 0 |
2013-08-29 | Acid Treatment | 2260.00 | 2260.50 | 0 |
2013-08-29 | Acid Treatment | 2246.00 | 2246.50 | 0 |
2013-08-29 | Acid Treatment | 2229.00 | 2229.50 | 0 |
2013-08-29 | Acid Treatment | 2209.00 | 2209.50 | 0 |
2013-08-29 | Acid Treatment | 2199.00 | 2199.50 | 0 |
2013-08-29 | Acid Treatment | 2186.00 | 2186.50 | 0 |
2013-08-30 | Acid Treatment | 2173.00 | 2173.50 | 0 |
2013-08-21 | Perforation | 2409.00 | 2409.50 | 17 |
2013-08-30 | Acid Treatment | 2163.00 | 2163.50 | 0 |
2013-08-30 | Acid Treatment | 2153.00 | 2153.50 | 0 |
2013-08-30 | Acid Treatment | 2140.00 | 2140.50 | 0 |
2013-08-30 | Acid Treatment | 2130.00 | 2130.50 | 0 |
2013-08-30 | Acid Treatment | 2115.00 | 2115.50 | 0 |
2013-08-30 | Acid Treatment | 2103.00 | 2103.50 | 0 |
2013-08-30 | Acid Treatment | 2089.00 | 2089.50 | 0 |
2013-08-30 | Acid Treatment | 2076.00 | 2076.50 | 0 |
2013-08-30 | Acid Treatment | 2063.00 | 2063.50 | 0 |
2013-08-30 | Acid Treatment | 2052.00 | 2052.50 | 0 |
2013-08-21 | Perforation | 2397.00 | 2397.50 | 17 |
2013-08-21 | Perforation | 2386.00 | 2386.50 | 17 |
2013-08-21 | Perforation | 2377.00 | 2377.50 | 17 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 2069 | 0.0 | 0.0 | 0.0 |
2014 | 7688 | 0.0 | 0.0 | 0.0 |
2015 | 8530 | 0.0 | 0.0 | 0.0 |
2016 | 8530 | 0.0 | 0.0 | 0.0 |
2017 | 8566 | 0.0 | 0.0 | 0.0 |
2018 | 7400 | 0.0 | 0.0 | 0.0 |
2019 | 8605 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-05-23 | No Incident Encountered | 0.00 | 0.00 |
2013-07-31 | No Incident Encountered | 0.00 | 0.00 |
2013-08-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]