X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0315030404000

Well Details

Well ID: 0315030404000
Loading map...
Location: 00/04-04-031-03W5/0
Location Alias: 00/04-04-31-03 W5M
Location Alias 2: 00/04-04-031-03 W5/00
Country: Canada
Province: Alberta
Township: 031
Meridian: 5
Range: 03
Section: 04
County/Municipality: Mountain View County
Well Name: TRANSGLOBE HARME 4-4-31-3
Operator Name: TransGlobe Energy Corporation
License Number: 0456878
License Date: 2013-05-09
License Status: Issued
Spud Date: 2013-07-05
Final Drill Date: 2013-07-17
Well Total Depth: 3456.00 m
Surface Hole Latitude: 51.634224
Surface Hole Longitude: -114.381549

For data sources see[1][2]

Well History

Date Event
2013-05-09 Obtained License
2013-07-06 Surface Casing Operation Performed
2013-07-08 Direction Drilling Operation Performed - Deviate
2013-07-10 Direction Drilling Operation Performed - Horizontal
2013-07-10 Well Log Performed
2013-07-12 Intermediate Casing Operation Performed
2013-07-17 Finished Drilling
2013-07-17 Well Log Performed
2013-07-17 Well Mode changed to Drilled and Cased
2013-07-20 Liner Casing Operation Performed
2013-07-20 Perforation Treatment Performed - Open-Hole Completion
2013-07-20 Rig Released
2013-07-31 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-01 Well Began Production
2013-08-01 Well Fluid changed to Crude Oil
2013-08-01 Well Mode changed to Pumping
2013-08-08 Well Log Performed
2013-08-09 Well Log Performed
2013-08-12 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-07-05 Precision Drilling Corporation 377 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-07-08 1786.10 Deviate (5 - 79 degrees)
2013-07-10 2212.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-07-20 Open Hole/Barefoot Completion 3454.00 3456.00 0
2013-07-31 Multi-Stage Fracture 2957.60 2957.70 0
2013-07-31 Multi-Stage Fracture 2892.00 2892.10 0
2013-07-31 Multi-Stage Fracture 2838.10 2838.20 0
2013-08-01 Multi-Stage Fracture 2771.50 2771.60 0
2013-08-01 Multi-Stage Fracture 2716.80 2716.90 0
2013-08-01 Multi-Stage Fracture 2649.10 2649.20 0
2013-08-01 Multi-Stage Fracture 2595.10 2595.20 0
2013-08-01 Multi-Stage Fracture 2541.10 2541.20 0
2013-08-01 Multi-Stage Fracture 2486.50 2486.60 0
2013-08-01 Multi-Stage Fracture 2430.40 2430.50 0
2013-07-31 Multi-Stage Fracture 3430.80 3431.80 0
2013-08-01 Multi-Stage Fracture 2375.10 2375.20 0
2013-08-01 Multi-Stage Fracture 2319.90 2320.00 0
2013-07-31 Multi-Stage Fracture 3381.50 3381.60 0
2013-07-31 Multi-Stage Fracture 3328.50 3328.60 0
2013-07-31 Multi-Stage Fracture 3258.60 3258.70 0
2013-07-31 Multi-Stage Fracture 3203.70 3203.80 0
2013-07-31 Multi-Stage Fracture 3134.50 3134.60 0
2013-07-31 Multi-Stage Fracture 3078.70 3078.80 0
2013-07-31 Multi-Stage Fracture 3014.00 3014.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-31 2013-08-01 2,051 4,206 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.0989 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 4.6834 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 2.8412 N/A
FRAC SAND. 50/140 CANADIAN Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 0.4058 N/A
Breaker V Baker Hughes Breaker Non-hazardous Not Available 100 0.1022 N/A
Sodium hypochlorite 7681-52-9 100 0.1022 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.1873 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 6.5188 N/A
FRW-31 Baker Hughes Friction Reducer Distillates. hydrotreated middle. petroleum 64742-46-7 100 0.0831 N/A
Non-hazardous Not Available 100 0.0831 N/A
InFlo 200 Baker Hughes Surfactant Alcohol 6896 100 0.0789 N/A
Alkyl alkoxylate 6896 100 0.0789 N/A
Glycol 6896 100 0.0789 N/A
Terpene 6896 100 0.0789 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-07-30 2013-08-01 Municipal Water 3594
2013-07-29 2013-08-01 Recycled Fracturing Water (treated at well site) 950
2013-07-24 2013-07-24 Municipal Water 21

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3331 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8155 0.0 0.0 0.0
2016 8765 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8039 0.0 0.0 0.0
2020 743 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-07-20 No Incident Encountered 0.00 0.00
2013-08-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References