X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324113503000

Well Details

Well ID: 0324113503000
Loading map...
Location: 00/03-35-032-11W4/0
Location Alias: 00/03-35-32-11 W4M
Location Alias 2: 00/03-35-032-11 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 11
Section: 35
County/Municipality: Special Areas No. 2
Well Name: SOC PROVOST 3-35-32-11
Operator Name: AlphaBow Energy Ltd.
License Number: 0162704
License Date: 1993-12-01
License Status: Suspension
Spud Date: 1993-12-07
Final Drill Date: 1993-12-12
Well Total Depth: 1130.00 m
Surface Hole Latitude: 51.780312
Surface Hole Longitude: -111.465923

For data sources see[1][2]

Well History

Date Event
1993-12-01 Obtained License
1993-12-08 Surface Casing Operation Performed
1993-12-09 Direction Drilling Operation Performed - Deviate
1993-12-12 Finished Drilling
1993-12-12 Well Log Performed
1993-12-12 Well Mode changed to Drilled and Cased
1993-12-13 Production Casing Operation Performed
1993-12-13 Rig Released
1993-12-22 Well Log Performed
1994-02-18 Perforation Treatment Performed - Jet Perforation
1994-03-01 Well Began Production
1994-03-01 Well Fluid changed to Gas
1994-03-01 Well Mode changed to Flowing
1995-11-30 Well Fluid changed to Gas
1995-11-30 Well Mode changed to Suspended
1995-12-15 Well Log Performed
1995-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-16 Perforation Treatment Performed - Jet Perforation
1995-12-16 Plug Back Performed
1995-12-16 Well Fluid changed to Gas
1995-12-16 Well Mode changed to Abandoned Zone
1995-12-19 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-12-09 302.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-02-18 Perforation 1066.80 1068.30 14
1994-02-18 Perforation 1069.30 1071.00 14
1995-12-16 Packing Device Capped w/Cement 1054.00 1062.00 0
1995-12-16 Perforation 925.50 927.40 13
1995-12-19 Fracture 925.50 927.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6530 0.0 0.0 0.0
1995 720 0.0 0.0 0.0

For data sources see[6]

References