X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324160514000

Well Details

Well ID: 0324160514000
Loading map...
Location: 00/14-05-032-16W4/0
Location Alias: 00/14-05-32-16 W4M
Location Alias 2: 00/14-05-032-16 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 16
Section: 05
County/Municipality: Starland County
Well Name: DEML CRAIGML 14-5-32-16
Operator Name: Direct Energy Marketing Limited
License Number: 0124383
License Date: 1986-11-14
License Status: RecCertified
Spud Date: 1986-11-19
Final Drill Date: 1986-11-24
Well Total Depth: 1336.50 m
Surface Hole Latitude: 51.718591
Surface Hole Longitude: -112.242581

For data sources see[1][2]

Well History

Date Event
1986-11-14 Obtained License
1986-11-20 Surface Casing Operation Performed
1986-11-24 Finished Drilling
1986-11-24 Well Log Performed
1986-11-24 Well Mode changed to Drilled and Cased
1986-11-25 Drill Stem Test Performed
1986-11-26 Production Casing Operation Performed
1986-11-26 Rig Released
1986-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-11-29 Perforation Treatment Performed - Jet Perforation
1986-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-01 Perforation Treatment Performed - Jet Perforation
1986-12-04 Perforation Treatment Performed - Fractured
1986-12-10 Well Began Production
1986-12-10 Well Fluid changed to Crude Oil
1986-12-10 Well Mode changed to Flowing
1987-06-09 Perforation Treatment Performed - Fractured
1987-06-09 Perforation Treatment Performed - Jet Perforation
1989-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-14 Plug Back Performed
1989-03-14 Well Abandoned
1989-03-14 Well Fluid changed to Crude Oil
1989-03-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-11-29 Perforation 1266.50 1267.50 13
1986-11-29 Perforation 1271.00 1272.00 13
1986-11-29 Acid Treatment 1266.50 1272.00 0
1986-12-01 Perforation 1237.00 1242.00 7
1986-12-01 Acid Treatment 1237.00 1242.00 0
1986-12-04 Fracture 1237.00 1242.00 0
1987-06-09 Perforation 1251.00 1255.00 7
1987-06-09 Fracture 1251.00 1255.00 0
1989-03-14 Packing Device Capped w/Cement 1224.00 1232.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 477 0.0 0.0 0.0
1987 4994 0.0 0.0 0.0

For data sources see[5]

References