If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0324173308000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.785383,"lon":-112.347149,"icon":""}]} |
Location: 00/08-33-032-17W4/0 | |
Location Alias: 00/08-33-32-17 W4M | |
Location Alias 2: 00/08-33-032-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 4 | |
Range: 17 | |
Section: 33 | |
County/Municipality: Starland County | |
Well Name: TEAC CRAIGML 8-33-32-17 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0352022 | |
License Date: 2006-02-14 | |
License Status: Issued | |
Spud Date: 2006-05-23 | |
Final Drill Date: 2006-05-23 | |
Well Total Depth: 583.00 m | |
Surface Hole Latitude: 51.785383 | |
Surface Hole Longitude: -112.347149 |
Date | Event |
---|---|
2006-02-14 | Obtained License |
2006-03-06 | Surface Casing Operation Performed |
2006-05-23 | Finished Drilling |
2006-05-23 | Well Mode changed to Drilled and Cased |
2006-05-24 | Production Casing Operation Performed |
2006-05-24 | Rig Released |
2006-06-06 | Well Log Performed |
2006-09-01 | Perforation Treatment Performed - Jet Perforation |
2006-09-01 | Well Log Performed |
2006-09-28 | Perforation Treatment Performed - Fractured |
2006-11-09 | Well Began Production |
2006-11-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-11-09 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-09-01 | Perforation | 324.10 | 326.10 | 7 |
2006-09-01 | Perforation | 160.30 | 161.30 | 7 |
2006-09-01 | Perforation | 157.70 | 158.70 | 7 |
2006-09-01 | Perforation | 155.80 | 156.80 | 7 |
2006-09-01 | Perforation | 151.20 | 151.70 | 13 |
2006-09-01 | Perforation | 149.00 | 150.00 | 7 |
2006-09-01 | Perforation | 145.40 | 147.40 | 7 |
2006-09-01 | Perforation | 142.30 | 143.80 | 7 |
2006-09-01 | Perforation | 137.40 | 138.40 | 7 |
2006-09-01 | Perforation | 132.50 | 134.00 | 7 |
2006-09-01 | Perforation | 130.30 | 131.30 | 7 |
2006-09-01 | Perforation | 303.40 | 304.40 | 7 |
2006-09-01 | Perforation | 123.10 | 124.60 | 7 |
2006-09-01 | Perforation | 116.80 | 117.80 | 7 |
2006-09-01 | Perforation | 103.80 | 104.30 | 13 |
2006-09-01 | Perforation | 99.50 | 100.50 | 7 |
2006-09-01 | Perforation | 97.60 | 98.10 | 13 |
2006-09-01 | Perforation | 95.20 | 96.20 | 7 |
2006-09-28 | Fracture | 324.10 | 326.10 | 0 |
2006-09-28 | Fracture | 303.40 | 304.40 | 0 |
2006-09-28 | Fracture | 269.90 | 270.40 | 0 |
2006-09-28 | Fracture | 245.00 | 246.50 | 0 |
2006-09-01 | Perforation | 269.90 | 270.40 | 13 |
2006-09-28 | Fracture | 233.30 | 233.80 | 0 |
2006-09-28 | Fracture | 186.60 | 188.90 | 0 |
2006-09-28 | Fracture | 184.80 | 185.30 | 0 |
2006-09-28 | Fracture | 160.30 | 163.00 | 0 |
2006-09-28 | Fracture | 155.80 | 158.70 | 0 |
2006-09-28 | Fracture | 151.20 | 151.70 | 0 |
2006-09-28 | Fracture | 145.40 | 150.00 | 0 |
2006-09-28 | Fracture | 142.30 | 143.80 | 0 |
2006-09-28 | Fracture | 137.40 | 138.40 | 0 |
2006-09-28 | Fracture | 132.50 | 134.00 | 0 |
2006-09-01 | Perforation | 245.00 | 246.50 | 7 |
2006-09-28 | Fracture | 130.30 | 131.30 | 0 |
2006-09-28 | Fracture | 123.10 | 124.60 | 0 |
2006-09-28 | Fracture | 116.80 | 117.80 | 0 |
2006-09-28 | Fracture | 103.80 | 104.30 | 0 |
2006-09-28 | Fracture | 99.50 | 100.50 | 0 |
2006-09-28 | Fracture | 95.20 | 98.10 | 0 |
2006-09-01 | Perforation | 233.30 | 233.80 | 13 |
2006-09-01 | Perforation | 187.40 | 188.90 | 7 |
2006-09-01 | Perforation | 186.60 | 187.10 | 13 |
2006-09-01 | Perforation | 184.80 | 185.30 | 13 |
2006-09-01 | Perforation | 162.00 | 163.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 910 | 0.0 | 0.0 | 0.0 |
2007 | 8692 | 0.0 | 0.0 | 0.0 |
2008 | 8664 | 0.0 | 0.0 | 0.0 |
2009 | 8558 | 0.0 | 0.0 | 0.0 |
2010 | 8725 | 0.0 | 0.0 | 0.0 |
2011 | 8626 | 0.0 | 0.0 | 0.0 |
2012 | 8636 | 0.0 | 0.0 | 0.0 |
2013 | 8635 | 0.0 | 0.0 | 0.0 |
2014 | 8644 | 0.0 | 0.0 | 0.0 |
2015 | 8073 | 0.0 | 0.0 | 0.0 |
2016 | 8703 | 0.0 | 0.0 | 0.0 |
2017 | 8711 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]