X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324190901020

Well Details

Well ID: 0324190901020
Loading map...
Location: 02/01-09-032-19W4/0
Location Alias: 02/01-09-32-19 W4M
Location Alias 2: 02/01-09-032-19 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 19
Section: 09
County/Municipality: Starland County
Well Name: TEAC 102 DELIA 1-9-32-19
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0215291
License Date: 1998-05-19
License Status: RecCertified
Spud Date: 1998-06-06
Final Drill Date: 1998-06-08
Well Total Depth: 675.00 m
Surface Hole Latitude: 51.724616
Surface Hole Longitude: -112.631901

For data sources see[1][2]

Well History

Date Event
1998-05-19 Obtained License
1998-06-07 Surface Casing Operation Performed
1998-06-08 Finished Drilling
1998-06-08 Well Log Performed
1998-06-08 Well Mode changed to Drilled and Cased
1998-06-09 Production Casing Operation Performed
1998-06-09 Rig Released
1998-06-10 Well Log Performed
1998-06-11 Perforation Treatment Performed - Jet Perforation
1998-06-24 Well Log Performed
1998-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-25 Perforation Treatment Performed - Jet Perforation
1998-06-25 Plug Back Performed
1998-12-16 Well Began Production
1998-12-16 Well Fluid changed to Gas
1998-12-16 Well Mode changed to Flowing
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2016-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-09-29 Plug Back Performed
2016-09-29 Well Fluid changed to Gas
2016-09-29 Well Mode changed to Abandoned Zone
2016-12-16 Well Abandoned
2016-12-16 Well Fluid changed to Gas
2016-12-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-06-11 Perforation 630.50 632.50 13
1998-06-25 Packing Device Capped w/Cement 611.00 619.00 0
1998-06-25 Perforation 556.50 558.50 13
2016-09-29 Packing Device Capped w/Cement 542.00 550.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 377 0.0 0.0 0.0
1999 8493 0.0 0.0 0.0
2000 8703 0.0 0.0 0.0
2001 8602 0.0 0.0 0.0
2002 8650 0.0 0.0 0.0
2003 8584 0.0 0.0 0.0
2004 8704 0.0 0.0 0.0
2005 8493 0.0 0.0 0.0
2006 8167 0.0 0.0 0.0
2007 8012 0.0 0.0 0.0
2008 8381 0.0 0.0 0.0
2009 2159 0.0 0.0 0.0
2011 2180 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-29 No Incident Encountered 0.00 0.00

For data sources see[6]

References