X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324192102000

Well Details

Well ID: 0324192102000
Loading map...
Location: 00/02-21-032-19W4/0
Location Alias: 00/02-21-32-19 W4M
Location Alias 2: 00/02-21-032-19 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 19
Section: 21
County/Municipality: Starland County
Well Name: TEAC DELIA 2-21-32-19
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0209368
License Date: 1997-11-26
License Status: Issued
Spud Date: 1998-01-20
Final Drill Date: 1998-01-24
Well Total Depth: 1400.00 m
Surface Hole Latitude: 51.753658
Surface Hole Longitude: -112.635056

For data sources see[1][2]

Well History

Date Event
1997-11-26 Obtained License
1998-01-21 Surface Casing Operation Performed
1998-01-24 Drill Stem Test Performed
1998-01-24 Finished Drilling
1998-01-24 Well Log Performed
1998-01-25 Drill Stem Test Performed
1998-01-26 Production Casing Operation Performed
1998-01-26 Rig Released
1998-01-26 Well Mode changed to Drilled and Cased
1998-02-03 Perforation Treatment Performed - Fractured
1998-02-03 Perforation Treatment Performed - Jet Perforation
1998-02-03 Well Log Performed
1998-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-12 Perforation Treatment Performed - Jet Perforation
1998-02-12 Plug Back Performed
1998-02-13 Perforation Treatment Performed - Jet Perforation
1998-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-17 Perforation Treatment Performed - Jet Perforation
1998-02-17 Plug Back Performed
1998-02-18 Perforation Treatment Performed - Fractured
1998-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-11 Perforation Treatment Performed - Jet Perforation
1998-03-11 Plug Back Performed
2000-05-31 Well Began Production
2000-05-31 Well Fluid changed to Gas
2000-05-31 Well Mode changed to Flowing
2008-12-31 Perforation Treatment Performed - Jet Perforation
2009-01-03 Perforation Treatment Performed - Fractured
2009-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-09 Plug Back Performed
2009-01-09 Well Fluid changed to Gas
2009-01-09 Well Mode changed to Abandoned Zone
2009-01-10 Perforation Treatment Performed - Jet Perforation
2009-01-10 Well Log Performed
2009-01-11 Perforation Treatment Performed - Fractured
2009-01-20 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-03 Perforation 1366.00 1369.00 13
1998-03-11 Perforation 585.00 587.00 13
1998-03-11 Perforation 574.00 577.00 13
2008-12-31 Perforation 460.20 462.90 20
2008-12-31 Perforation 477.10 478.80 20
2008-12-31 Perforation 473.30 475.80 20
2009-01-03 Fracture 460.20 462.90 0
2009-01-03 Fracture 477.10 478.80 0
2009-01-03 Fracture 473.30 475.80 0
2009-01-09 Packing Device Capped w/Cement 564.00 572.00 0
2009-01-10 Perforation 238.00 238.50 20
1998-02-03 Fracture 1366.00 1369.00 0
2009-01-10 Perforation 242.00 242.50 20
2009-01-10 Perforation 234.40 235.40 20
2009-01-10 Perforation 219.60 220.60 20
2009-01-10 Perforation 221.00 222.10 20
2009-01-10 Perforation 244.50 245.50 20
2009-01-10 Perforation 343.90 344.80 20
2009-01-10 Perforation 361.70 362.20 20
2009-01-10 Perforation 337.30 338.80 20
2009-01-10 Perforation 285.60 287.70 20
2009-01-10 Perforation 326.10 326.90 20
1998-02-12 Packing Device Capped w/Cement 1356.00 1364.00 0
2009-01-11 Fracture 238.00 238.50 0
2009-01-11 Fracture 242.00 242.50 0
2009-01-11 Fracture 234.40 235.40 0
2009-01-11 Fracture 219.60 220.60 0
2009-01-11 Fracture 221.00 222.10 0
2009-01-11 Fracture 244.50 245.50 0
2009-01-11 Fracture 343.90 344.80 0
2009-01-11 Fracture 361.70 362.20 0
2009-01-11 Fracture 337.30 338.80 0
2009-01-11 Fracture 285.60 287.40 0
1998-02-12 Perforation 1294.00 1296.00 13
2009-01-11 Fracture 326.10 326.90 0
1998-02-13 Perforation 666.00 670.00 13
1998-02-17 Packing Device Capped w/Cement 1284.00 1292.00 0
1998-02-17 Perforation 655.50 657.50 13
1998-02-18 Fracture 655.50 657.50 0
1998-03-11 Packing Device Capped w/Cement 642.00 650.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 162 0.0 0.0 0.0
2000 5133 0.0 0.0 0.0
2001 8699 0.0 0.0 0.0
2002 8658 0.0 0.0 0.0
2003 8591 0.0 0.0 0.0
2004 8581 0.0 0.0 0.0
2005 8754 0.0 0.0 0.0
2006 8749 0.0 0.0 0.0
2007 8746 0.0 0.0 0.0
2008 8784 0.0 0.0 0.0

For data sources see[5]

References