X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324193003000

Well Details

Well ID: 0324193003000
Loading map...
Location: 00/03-30-032-19W4/0
Location Alias: 00/03-30-32-19 W4M
Location Alias 2: 00/03-30-032-19 W4/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 19
Section: 30
County/Municipality: Starland County
Well Name: TEAC DELIA 3-30-32-19
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0401333
License Date: 2008-09-24
License Status: Issued
Spud Date: 2008-10-10
Final Drill Date: 2008-10-11
Well Total Depth: 482.00 m
Surface Hole Latitude: 51.768655
Surface Hole Longitude: -112.689117

For data sources see[1][2]

Well History

Date Event
2008-09-24 Obtained License
2008-10-10 Surface Casing Operation Performed
2008-10-11 Finished Drilling
2008-10-11 Production Casing Operation Performed
2008-10-11 Rig Released
2008-10-11 Well Mode changed to Drilled and Cased
2008-10-31 Well Log Performed
2008-11-11 Perforation Treatment Performed - Jet Perforation
2008-11-11 Well Log Performed
2008-12-10 Perforation Treatment Performed - Fractured
2009-03-13 Well Began Production
2009-03-13 Well Fluid changed to Coalbed Methane-Coals and Other
2009-03-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-11-11 Perforation 343.50 344.30 20
2008-11-11 Perforation 214.50 219.90 20
2008-11-11 Perforation 211.40 212.40 20
2008-11-11 Perforation 189.50 190.10 20
2008-11-11 Perforation 177.50 178.80 20
2008-11-11 Perforation 165.80 167.50 20
2008-11-11 Perforation 160.10 160.80 20
2008-11-11 Perforation 130.40 131.70 20
2008-11-11 Perforation 123.70 124.90 20
2008-11-11 Perforation 102.10 103.30 20
2008-12-10 Fracture 343.50 344.30 0
2008-11-11 Perforation 326.90 328.40 20
2008-12-10 Fracture 326.90 328.40 0
2008-12-10 Fracture 321.80 323.40 0
2008-12-10 Fracture 309.80 310.80 0
2008-12-10 Fracture 273.70 276.40 0
2008-12-10 Fracture 248.10 254.30 0
2008-12-10 Fracture 243.40 246.10 0
2008-12-10 Fracture 233.70 235.50 0
2008-12-10 Fracture 214.50 219.90 0
2008-12-10 Fracture 211.40 212.40 0
2008-12-10 Fracture 189.50 190.10 0
2008-11-11 Perforation 321.80 323.40 20
2008-12-10 Fracture 177.50 178.80 0
2008-12-10 Fracture 165.80 167.50 0
2008-12-10 Fracture 160.10 160.80 0
2008-12-10 Fracture 130.40 131.70 0
2008-12-10 Fracture 123.70 124.90 0
2008-12-10 Fracture 102.10 103.30 0
2008-11-11 Perforation 309.80 310.80 20
2008-11-11 Perforation 273.70 276.40 20
2008-11-11 Perforation 252.30 254.30 20
2008-11-11 Perforation 248.10 250.90 20
2008-11-11 Perforation 243.40 246.10 20
2008-11-11 Perforation 233.70 235.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6793 0.0 0.0 0.0
2010 8347 0.0 0.0 0.0
2011 8312 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8553 0.0 0.0 0.0
2015 6576 0.0 0.0 0.0
2016 1623 0.0 0.0 0.0
2017 5238 0.0 0.0 0.0
2018 5831 0.0 0.0 0.0
2019 1416 0.0 0.0 0.0

For data sources see[5]

References