X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0324201005002

Well Details

Well ID: 0324201005002
Loading map...
Location: 00/05-10-032-20W4/2
Location Alias: 00/05-10-32-20 W4M
Location Alias 2: 00/05-10-032-20 W4/02
Country: Canada
Province: Alberta
Township: 032
Meridian: 4
Range: 20
Section: 10
County/Municipality: Starland County
Well Name: TEAC ROWLEY 5-10-32-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0065096
License Date: 1977-08-03
License Status: Suspension
Spud Date: 1977-08-08
Final Drill Date: 1977-08-24
Well Total Depth: 1405.10 m
Surface Hole Latitude: 51.726650
Surface Hole Longitude: -112.764234

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-08-03 Obtained License
1977-08-18 Drill Stem Test Performed
1977-08-20 Drill Stem Test Performed
1977-08-21 Drill Stem Test Performed
1977-08-22 Drill Stem Test Performed
1977-08-23 Drill Stem Test Performed
1977-08-24 Finished Drilling
1977-08-25 Production Casing Operation Performed
1977-09-14 Perforation Treatment Performed - Jet Perforation
1977-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-11-17 Perforation Treatment Performed - Fractured
1990-08-28 Perforation Treatment Performed - Jet Perforation
1990-08-28 Well Mode changed to Drilled and Cased
1990-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-30 Perforation Treatment Performed - Jet Perforation
1990-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-11-05 Well Log Performed
2013-01-12 Well Log Performed
2014-01-12 Well Log Performed
2014-01-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-09-14 Perforation 1351.20 1353.90 3
1990-09-04 Acid Treatment 1345.50 1347.50 0
2007-11-05 Packing Device Capped w/Cement 1332.00 1340.00 0
1977-09-14 Perforation 1355.10 1355.80 3
1977-09-14 Perforation 1357.00 1357.60 3
1977-09-15 Acid Treatment 1351.20 1357.60 0
1977-11-17 Fracture 1351.20 1357.60 0
1990-08-28 Perforation 1374.00 1376.50 13
1990-08-29 Acid Treatment 1374.00 1376.50 0
1990-08-30 Perforation 1345.50 1347.50 13
1990-08-30 Acid Treatment 1345.50 1357.60 0

For data sources see[4]



References