If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0324203605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.786164,"lon":-112.718585,"icon":""}]} |
| Location: 00/05-36-032-20W4/0 | |
| Location Alias: 00/05-36-32-20 W4M | |
| Location Alias 2: 00/05-36-032-20 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 4 | |
| Range: 20 | |
| Section: 36 | |
| County/Municipality: Starland County | |
| Well Name: TEAC DELIA 5-36-32-20 | |
| Operator Name: Trident Exploration (Alberta) Corp. | |
| License Number: 0394794 | |
| License Date: 2008-02-27 | |
| License Status: Issued | |
| Spud Date: 2008-08-02 | |
| Final Drill Date: 2008-09-05 | |
| Well Total Depth: 471.00 m | |
| Surface Hole Latitude: 51.786164 | |
| Surface Hole Longitude: -112.718585 |
| Date | Event |
|---|---|
| 2008-02-27 | Obtained License |
| 2008-08-02 | Surface Casing Operation Performed |
| 2008-09-05 | Finished Drilling |
| 2008-09-05 | Production Casing Operation Performed |
| 2008-09-05 | Rig Released |
| 2008-09-05 | Well Mode changed to Drilled and Cased |
| 2008-10-10 | Well Log Performed |
| 2008-10-25 | Perforation Treatment Performed - Jet Perforation |
| 2008-11-10 | Well Log Performed |
| 2008-12-06 | Perforation Treatment Performed - Fractured |
| 2009-03-26 | Well Began Production |
| 2009-03-26 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-03-26 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-10-25 | Perforation | 346.80 | 348.00 | 20 |
| 2008-10-25 | Perforation | 240.90 | 243.50 | 20 |
| 2008-10-25 | Perforation | 231.60 | 233.80 | 20 |
| 2008-10-25 | Perforation | 216.00 | 220.60 | 20 |
| 2008-10-25 | Perforation | 177.90 | 179.90 | 20 |
| 2008-10-25 | Perforation | 167.70 | 169.80 | 20 |
| 2008-10-25 | Perforation | 156.10 | 157.50 | 20 |
| 2008-10-25 | Perforation | 142.00 | 142.90 | 20 |
| 2008-10-25 | Perforation | 129.90 | 131.20 | 20 |
| 2008-10-25 | Perforation | 123.60 | 125.00 | 20 |
| 2008-12-06 | Fracture | 346.80 | 348.00 | 0 |
| 2008-10-25 | Perforation | 335.20 | 336.50 | 20 |
| 2008-12-06 | Fracture | 335.20 | 336.50 | 0 |
| 2008-12-06 | Fracture | 329.70 | 331.60 | 0 |
| 2008-12-06 | Fracture | 325.00 | 326.80 | 0 |
| 2008-12-06 | Fracture | 312.70 | 314.10 | 0 |
| 2008-12-06 | Fracture | 270.50 | 273.00 | 0 |
| 2008-12-06 | Fracture | 250.70 | 255.60 | 0 |
| 2008-12-06 | Fracture | 246.70 | 249.60 | 0 |
| 2008-12-06 | Fracture | 240.90 | 243.50 | 0 |
| 2008-12-06 | Fracture | 231.60 | 233.80 | 0 |
| 2008-12-06 | Fracture | 216.00 | 220.60 | 0 |
| 2008-10-25 | Perforation | 329.70 | 331.60 | 20 |
| 2008-12-06 | Fracture | 177.90 | 179.90 | 0 |
| 2008-12-06 | Fracture | 167.70 | 169.80 | 0 |
| 2008-12-06 | Fracture | 156.10 | 157.50 | 0 |
| 2008-12-06 | Fracture | 142.00 | 142.90 | 0 |
| 2008-12-06 | Fracture | 129.90 | 131.20 | 0 |
| 2008-12-06 | Fracture | 123.60 | 125.00 | 0 |
| 2008-10-25 | Perforation | 325.00 | 326.80 | 20 |
| 2008-10-25 | Perforation | 312.70 | 314.10 | 20 |
| 2008-10-25 | Perforation | 270.50 | 273.00 | 20 |
| 2008-10-25 | Perforation | 253.60 | 255.60 | 20 |
| 2008-10-25 | Perforation | 250.70 | 252.30 | 20 |
| 2008-10-25 | Perforation | 246.70 | 249.60 | 20 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2009 | 6642 | 0.0 | 0.0 | 0.0 |
| 2010 | 8696 | 0.0 | 0.0 | 0.0 |
| 2011 | 8678 | 0.0 | 0.0 | 0.0 |
| 2012 | 7892 | 0.0 | 0.0 | 0.0 |
| 2013 | 8658 | 0.0 | 0.0 | 0.0 |
| 2014 | 8580 | 0.0 | 0.0 | 0.0 |
| 2015 | 8227 | 0.0 | 0.0 | 0.0 |
| 2016 | 8763 | 0.0 | 0.0 | 0.0 |
| 2017 | 8680 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]