If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0325011908000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.758088,"lon":-114.125398,"icon":""}]} |
| Location: 00/08-19-032-01W5/0 | |
| Location Alias: 00/08-19-32-01 W5M | |
| Location Alias 2: 00/08-19-032-01 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 5 | |
| Range: 01 | |
| Section: 19 | |
| County/Municipality: Mountain View County | |
| Well Name: NAL GARR 8-19-32-1 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0066382 | |
| License Date: 1977-10-27 | |
| License Status: Abandoned | |
| Spud Date: 1977-11-06 | |
| Final Drill Date: 1977-12-09 | |
| Well Total Depth: 2685.30 m | |
| Surface Hole Latitude: 51.758088 | |
| Surface Hole Longitude: -114.125398 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1977-10-27 | Obtained License |
| 1977-11-22 | Drill Stem Test Performed |
| 1977-12-09 | Finished Drilling |
| 1977-12-09 | Well Mode changed to Drilled and Cased |
| 1977-12-12 | Production Casing Operation Performed |
| 1978-01-19 | Perforation Treatment Performed - Jet Perforation |
| 1978-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1978-05-18 | Well Began Production |
| 1978-05-18 | Well Fluid changed to Gas |
| 1978-05-18 | Well Mode changed to Flowing |
| 1983-08-10 | Perforation Treatment Performed - Jet Perforation |
| 1983-08-13 | Perforation Treatment Performed - Fractured |
| 1983-08-24 | Perforation Treatment Performed - Cement Squeeze |
| 2003-12-01 | Well Fluid changed to Gas |
| 2003-12-01 | Well Mode changed to Suspended |
| 2016-09-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-07 | Plug Back Performed |
| 2016-09-07 | Well Fluid changed to Gas |
| 2016-09-07 | Well Log Performed |
| 2016-09-07 | Well Mode changed to Abandoned Zone |
| 2016-09-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-08 | Plug Back Performed |
| 2016-09-08 | Well Log Performed |
| 2016-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-09 | Plug Back Performed |
| 2016-09-10 | Well Log Performed |
| 2016-09-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-11 | Plug Back Performed |
| 2016-09-12 | Well Log Performed |
| 2016-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-13 | Plug Back Performed |
| 2016-09-14 | Well Log Performed |
| 2016-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-15 | Plug Back Performed |
| 2016-09-16 | Well Log Performed |
| 2016-09-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-17 | Plug Back Performed |
| 2016-09-18 | Well Log Performed |
| 2016-09-19 | Well Log Performed |
| 2016-09-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-20 | Plug Back Performed |
| 2016-09-21 | Well Log Performed |
| 2016-09-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2016-09-22 | Plug Back Performed |
| 2016-11-11 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1978-01-19 | Perforation | 2644.40 | 2647.20 | 13 |
| 2016-09-09 | Packing Device Capped w/Cement | 1498.50 | 1513.50 | 0 |
| 2016-09-11 | Packing Device Capped w/Cement | 1364.50 | 1379.50 | 0 |
| 2016-09-13 | Packing Device Capped w/Cement | 1335.00 | 1348.50 | 0 |
| 2016-09-15 | Packing Device Capped w/Cement | 1104.50 | 1119.50 | 0 |
| 2016-09-17 | Packing Device Capped w/Cement | 599.50 | 614.50 | 0 |
| 2016-09-20 | Packing Device Capped w/Cement | 556.50 | 568.50 | 0 |
| 2016-09-22 | Packing Device Capped w/Cement | 252.10 | 368.50 | 0 |
| 1978-01-19 | Perforation | 2648.10 | 2649.90 | 13 |
| 1978-01-19 | Perforation | 2652.40 | 2654.20 | 13 |
| 1978-01-26 | Acid Treatment | 2644.40 | 2654.20 | 0 |
| 1983-08-10 | Perforation | 2016.60 | 2023.00 | 13 |
| 1983-08-13 | Fracture | 2016.60 | 2023.00 | 0 |
| 1983-08-24 | Cement Squeeze | 2016.60 | 2023.00 | 0 |
| 2016-09-07 | Packing Device Capped w/Cement | 2604.30 | 2612.30 | 0 |
| 2016-09-08 | Packing Device Capped w/Cement | 2002.50 | 2010.50 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1978 | 3966 | 0.0 | 0.0 | 0.0 |
| 1979 | 7858 | 0.0 | 0.0 | 0.0 |
| 1980 | 7011 | 0.0 | 0.0 | 0.0 |
| 1981 | 6040 | 0.0 | 0.0 | 0.0 |
| 1982 | 4105 | 0.0 | 0.0 | 0.0 |
| 1983 | 6455 | 0.0 | 0.0 | 0.0 |
| 1984 | 6832 | 0.0 | 0.0 | 0.0 |
| 1985 | 7617 | 0.0 | 0.0 | 0.0 |
| 1986 | 8028 | 0.0 | 0.0 | 0.0 |
| 1987 | 7124 | 0.0 | 0.0 | 0.0 |
| 1988 | 7281 | 0.0 | 0.0 | 0.0 |
| 1989 | 8243 | 0.0 | 0.0 | 0.0 |
| 1990 | 8286 | 0.0 | 0.0 | 0.0 |
| 1991 | 8213 | 0.0 | 0.0 | 0.0 |
| 1992 | 8418 | 0.0 | 0.0 | 0.0 |
| 1993 | 8118 | 0.0 | 0.0 | 0.0 |
| 1994 | 8514 | 0.0 | 0.0 | 0.0 |
| 1995 | 5576 | 0.0 | 0.0 | 0.0 |
| 1996 | 8360 | 0.0 | 0.0 | 0.0 |
| 1997 | 7702 | 0.0 | 0.0 | 0.0 |
| 1998 | 488 | 0.0 | 0.0 | 0.0 |
| 2002 | 1024 | 0.0 | 0.0 | 0.0 |
| 2003 | 4175 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-09-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]