If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325022013000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. To navigate, press the arrow keys. ![]() |
Location: 00/13-20-032-02W5/0 | |
Location Alias: 00/13-20-32-02 W5M | |
Location Alias 2: 00/13-20-032-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 02 | |
Section: 20 | |
County/Municipality: Mountain View County | |
Well Name: TANTALUS GARR 13-20-32-2 | |
Operator Name: Persist Oil And Gas Inc. | |
License Number: 0365759 | |
License Date: 2006-11-09 | |
License Status: Amended | |
Spud Date: 2007-05-01 | |
Final Drill Date: 2007-05-19 | |
Well Total Depth: 3380.00 m | |
Surface Hole Latitude: 51.770050 | |
Surface Hole Longitude: -114.245063 |
Date | Event |
---|---|
2006-11-09 | Obtained License |
2007-05-01 | Surface Casing Operation Performed |
2007-05-06 | Direction Drilling Operation Performed - Horizontal |
2007-05-08 | Intermediate Casing Operation Performed |
2007-05-11 | Well Log Performed |
2007-05-18 | Well Log Performed |
2007-05-19 | Finished Drilling |
2007-05-19 | Well Log Performed |
2007-05-19 | Well Mode changed to Drilled and Cased |
2007-05-20 | Liner Casing Operation Performed |
2007-05-20 | Perforation Treatment Performed - Slotted Liner or Casing |
2007-05-20 | Rig Released |
2007-06-13 | Well Log Performed |
2007-06-14 | Perforation Treatment Performed - Open-Hole Completion |
2007-06-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-06-29 | Well Began Production |
2007-06-29 | Well Fluid changed to Gas |
2007-06-29 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2007-05-06 | 2153.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-05-20 | Slotted Liner | 2528.60 | 2790.20 | 0 |
2007-06-14 | Open Hole/Barefoot Completion | 2790.20 | 3380.00 | 0 |
2007-06-15 | Acid Treatment | 3100.00 | 3372.00 | 0 |
2007-06-15 | Acid Treatment | 2790.00 | 3040.00 | 0 |
2007-06-16 | Acid Treatment | 2790.00 | 3040.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 4447 | 0.0 | 0.0 | 0.0 |
2008 | 8508 | 0.0 | 0.0 | 0.0 |
2009 | 8233 | 0.0 | 0.0 | 0.0 |
2010 | 8125 | 0.0 | 0.0 | 0.0 |
2011 | 8022 | 0.0 | 0.0 | 0.0 |
2012 | 8567 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8700 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]