If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0325030508000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.716715,"lon":-114.404163,"icon":""}]} |
Location: 00/08-05-032-03W5/0 | |
Location Alias: 00/08-05-32-03 W5M | |
Location Alias 2: 00/08-05-032-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 032 | |
Meridian: 5 | |
Range: 03 | |
Section: 05 | |
County/Municipality: Mountain View County | |
Well Name: EMC HZ HARME 8-5-32-3 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0440006 | |
License Date: 2011-12-01 | |
License Status: Issued | |
Spud Date: 2012-05-24 | |
Final Drill Date: 2012-06-03 | |
Well Total Depth: 3768.00 m | |
Surface Hole Latitude: 51.716715 | |
Surface Hole Longitude: -114.404163 |
Date | Event |
---|---|
2011-12-01 | Obtained License |
2012-05-26 | Surface Casing Operation Performed |
2012-05-27 | Well Log Performed |
2012-05-28 | Direction Drilling Operation Performed - Deviate |
2012-05-30 | Direction Drilling Operation Performed - Horizontal |
2012-06-03 | Finished Drilling |
2012-06-03 | Well Mode changed to Drilled and Cased |
2012-06-04 | Perforation Treatment Performed - Open-Hole Completion |
2012-06-04 | Production Casing Operation Performed |
2012-06-04 | Rig Released |
2012-06-22 | Well Log Performed |
2012-07-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-08 | Well Began Production |
2012-07-08 | Well Fluid changed to Crude Oil |
2012-07-08 | Well Mode changed to Flowing |
2012-09-02 | Well Fluid changed to Crude Oil |
2012-09-02 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-05-24 | Nabors Drilling Limited | 30 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-05-28 | 1072.00 | Deviate (5 - 79 degrees) |
2012-05-30 | 2298.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-06-04 | Open Hole/Barefoot Completion | 3763.00 | 3768.00 | 0 |
2012-07-07 | Multi-Stage Fracture | 3118.30 | 3740.00 | 0 |
2012-07-08 | Multi-Stage Fracture | 2430.60 | 3055.90 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2508 | 0.0 | 0.0 | 0.0 |
2013 | 5819 | 0.0 | 0.0 | 0.0 |
2014 | 5128 | 0.0 | 0.0 | 0.0 |
2015 | 7070 | 0.0 | 0.0 | 0.0 |
2016 | 8231 | 0.0 | 0.0 | 0.0 |
2017 | 7590 | 0.0 | 0.0 | 0.0 |
2018 | 3257 | 0.0 | 0.0 | 0.0 |
2019 | 8617 | 0.0 | 0.0 | 0.0 |
2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-04 | No Incident Encountered | 0.00 | 0.00 |
2012-08-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]