X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325030610000

Well Details

Well ID: 0325030610000
Loading map...
Location: 00/10-06-032-03W5/0
Location Alias: 00/10-06-32-03 W5M
Location Alias 2: 00/10-06-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 06
County/Municipality: Mountain View County
Well Name: EMCL HZ HARME 10-6-32-3
Operator Name: ExxonMobil Canada Ltd.
License Number: 0460716
License Date: 2013-11-04
License Status: Amended
Spud Date: 2014-08-18
Final Drill Date: 2014-08-31
Well Total Depth: 4600.00 m
Surface Hole Latitude: 51.737322
Surface Hole Longitude: -114.419547

For data sources see[1][2]

Well History

Date Event
2013-11-04 Obtained License
2014-08-19 Surface Casing Operation Performed
2014-08-21 Direction Drilling Operation Performed - Deviate
2014-08-23 Direction Drilling Operation Performed - Horizontal
2014-08-23 Well Log Performed
2014-08-31 Finished Drilling
2014-08-31 Well Log Performed
2014-08-31 Well Mode changed to Drilled and Cased
2014-09-01 Production Casing Operation Performed
2014-09-02 Perforation Treatment Performed - Open-Hole Completion
2014-09-02 Rig Released
2014-10-01 Well Began Production
2014-10-01 Well Fluid changed to Crude Oil
2014-10-01 Well Mode changed to Flowing
2014-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-21 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-23 Well Fluid changed to Crude Oil
2015-01-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-08-18 Nabors Drilling Limited 30 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-08-21 1412.60 Deviate (5 - 79 degrees)
2014-08-23 2409.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-09-02 Open Hole/Barefoot Completion 4595.00 4600.00 0
2014-10-19 Multi-Stage Fracture 3891.30 3891.40 0
2014-10-19 Multi-Stage Fracture 3798.60 3798.70 0
2014-10-20 Multi-Stage Fracture 3719.30 3719.40 0
2014-10-20 Multi-Stage Fracture 3628.80 3628.90 0
2014-10-20 Multi-Stage Fracture 3550.50 3550.60 0
2014-10-21 Multi-Stage Fracture 3471.40 3471.50 0
2014-10-21 Multi-Stage Fracture 3384.50 3384.60 0
2014-10-21 Multi-Stage Fracture 3293.20 3293.30 0
2014-10-21 Multi-Stage Fracture 3216.10 3216.20 0
2014-10-21 Multi-Stage Fracture 3137.70 3137.80 0
2014-10-19 Multi-Stage Fracture 4558.20 4558.30 0
2014-10-21 Multi-Stage Fracture 3044.20 3044.30 0
2014-10-21 Multi-Stage Fracture 2965.60 2965.70 0
2014-10-21 Multi-Stage Fracture 2873.00 2873.10 0
2014-10-22 Multi-Stage Fracture 2797.90 2798.00 0
2014-10-22 Multi-Stage Fracture 2706.70 2706.80 0
2014-10-22 Multi-Stage Fracture 2627.50 2627.60 0
2014-10-22 Multi-Stage Fracture 2548.90 2549.00 0
2014-10-19 Multi-Stage Fracture 4477.50 4477.60 0
2014-10-19 Multi-Stage Fracture 4387.60 4387.70 0
2014-10-19 Multi-Stage Fracture 4309.20 4309.30 0
2014-10-19 Multi-Stage Fracture 4216.50 4216.60 0
2014-10-19 Multi-Stage Fracture 4137.80 4137.90 0
2014-10-19 Multi-Stage Fracture 4048.90 4049.00 0
2014-10-19 Multi-Stage Fracture 3969.80 3969.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-19 2014-10-22 2,029 0 N/A
2 2014-10-19 2014-10-19 2,029 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 88.5854 N/A
Slickwater/SAPPHIRE VF. N002 Schlumberger Crystalline silica 14808-60-7 100 3.4441 N/A
Slickwater/SAPPHIRE VF. N002 Schlumberger Energizing Fluid 2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.1483 N/A
2-methyl-2h-isothiazol-3-one 2682-20-4 100 0 N/A
5-chloro-2-methyl-2h-isothiazolol-3-one 26172-55-4 100 0.0001 N/A
Acetic acid 64-19-7 100 0 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0083 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0007 N/A
Alcohols. C9-11-iso-. C10-rich 68526-85-2 100 0.0007 N/A
Cristobalite 14464-46-1 100 0 N/A
Diatomaceous earth. calcined 91053-39-3 100 0.0016 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0003 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0075 N/A
Magnesium chloride 7786-30-3 100 0.0001 N/A
Magnesium nitrate 10377-60-3 100 0.0003 N/A
Nitrogen. liquid form 7727-37-9 100 5.3977 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0085 N/A
Propan-2-ol 67-63-0 100 0.0212 N/A
Sodium chloride 7647-14-5 100 0.0069 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.0003 N/A
Sorbitan. (Z)-9-octadecenoate (2:3) 8007-43-0 100 0.0005 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A
2 Slickwater/SAPPHIRE VF. N002 Schlumberger Energizing Fluid 2-butoxyethanol 111-76-2 100 0.0014 N/A
Butan-1-ol 71-36-3 100 0.0005 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.1206 N/A
Ethylene Glycol 107-21-1 100 0 N/A
Linear/branched c11 alcohol ethoxylate (3 eo) 127036-24-2 100 0.0004 N/A
Linear/branched c11 alcohol ethoxylate (8 eo) 127036-24-2 100 0.0022 N/A
Polyvinyl acetate. partially hydrolyzed 304443-60-5 100 0.0005 N/A
Sodium chloroacetate 3926-62-3 100 0.0015 N/A
Undecanol. branched and linear (impurity) 128973-77-3 100 0.0001 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-09-25 2014-10-21 Central Water Distribution Facility 6999

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 377 0.0 0.0 0.0
2015 7541 0.0 0.0 0.0
2016 7681 0.0 0.0 0.0
2017 8282 0.0 0.0 0.0
2018 7308 0.0 0.0 0.0
2019 8533 0.0 0.0 0.0
2020 2166 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-02 No Incident Encountered 0.00 0.00
2015-01-09 No Incident Encountered 0.00 0.00

For data sources see[10]

References