If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0325033308020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.786827,"lon":-114.38449,"icon":""}]} |
| Location: 02/08-33-032-03W5/0 | |
| Location Alias: 02/08-33-32-03 W5M | |
| Location Alias 2: 02/08-33-032-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 33 | |
| County/Municipality: Mountain View County | |
| Well Name: RIDGEBACK HARME 8-33-32-3 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0454368 | |
| License Date: 2013-01-30 | |
| License Status: Issued | |
| Spud Date: 2013-02-23 | |
| Final Drill Date: 2013-03-03 | |
| Well Total Depth: 3576.00 m | |
| Surface Hole Latitude: 51.786827 | |
| Surface Hole Longitude: -114.384490 |
| Date | Event |
|---|---|
| 2013-01-30 | Obtained License |
| 2013-02-25 | Surface Casing Operation Performed |
| 2013-02-27 | Direction Drilling Operation Performed - Deviate |
| 2013-02-28 | Direction Drilling Operation Performed - Horizontal |
| 2013-03-03 | Finished Drilling |
| 2013-03-03 | Well Log Performed |
| 2013-03-03 | Well Mode changed to Drilled and Cased |
| 2013-03-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-03-05 | Production Casing Operation Performed |
| 2013-03-05 | Rig Released |
| 2013-03-11 | Well Log Performed |
| 2013-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-03-22 | Well Began Production |
| 2013-03-22 | Well Fluid changed to Crude Oil |
| 2013-03-22 | Well Mode changed to Flowing |
| 2013-03-29 | Well Log Performed |
| 2013-10-08 | Well Fluid changed to Crude Oil |
| 2013-10-08 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-02-23 | Savanna Drilling Corp. | 652 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-02-27 | 1532.80 | Deviate (5 - 79 degrees) |
| 2013-02-28 | 2153.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-03-05 | Open Hole/Barefoot Completion | 3571.00 | 3576.00 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3000.40 | 3000.50 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2927.90 | 2928.00 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2868.80 | 2868.90 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2796.40 | 2796.50 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2724.00 | 2724.10 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2665.00 | 2665.10 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2594.10 | 2594.20 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2522.00 | 2522.10 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2450.40 | 2450.50 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2391.70 | 2391.80 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3545.90 | 3546.00 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2319.10 | 2319.20 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 2245.30 | 2245.40 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3481.20 | 3481.30 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3408.80 | 3408.90 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3336.30 | 3336.40 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3277.10 | 3277.20 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3204.60 | 3204.70 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3132.00 | 3132.10 | 0 |
| 2013-03-21 | Multi-Stage Fracture | 3073.00 | 3073.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-03-21 | 2013-03-21 | 1,942 | 2,143 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 79.4501 | N/A | |||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.8122 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.6396 | N/A | ||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 3.6639 | N/A | ||
| Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0135 | N/A | |
| Water | 7732-18-5 | 100 | 0.0148 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.1918 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.088 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0901 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0884 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.106 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.088 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.0906 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0901 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.2509 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0641 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-03-21 | 2013-03-21 | Surface Water - River | 2200 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 3008 | 0.0 | 0.0 | 0.0 |
| 2014 | 8579 | 0.0 | 0.0 | 0.0 |
| 2015 | 8147 | 0.0 | 0.0 | 0.0 |
| 2016 | 8495 | 0.0 | 0.0 | 0.0 |
| 2017 | 8511 | 0.0 | 0.0 | 0.0 |
| 2018 | 7986 | 0.0 | 0.0 | 0.0 |
| 2019 | 8471 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-03-05 | No Incident Encountered | 0.00 | 0.00 |
| 2013-03-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]