If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0325033309000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.787096,"lon":-114.384491,"icon":""}]} |
| Location: 00/09-33-032-03W5/0 | |
| Location Alias: 00/09-33-32-03 W5M | |
| Location Alias 2: 00/09-33-032-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 33 | |
| County/Municipality: Mountain View County | |
| Well Name: RIDGEBACK HARME 9-33-32-3 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0454005 | |
| License Date: 2013-01-23 | |
| License Status: Issued | |
| Spud Date: 2013-02-05 | |
| Final Drill Date: 2013-02-19 | |
| Well Total Depth: 3698.00 m | |
| Surface Hole Latitude: 51.787096 | |
| Surface Hole Longitude: -114.384491 |
| Date | Event |
|---|---|
| 2013-01-23 | Obtained License |
| 2013-02-07 | Surface Casing Operation Performed |
| 2013-02-09 | Direction Drilling Operation Performed - Deviate |
| 2013-02-11 | Direction Drilling Operation Performed - Horizontal |
| 2013-02-19 | Finished Drilling |
| 2013-02-19 | Well Log Performed |
| 2013-02-19 | Well Mode changed to Drilled and Cased |
| 2013-02-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-02-21 | Production Casing Operation Performed |
| 2013-02-21 | Rig Released |
| 2013-03-11 | Well Log Performed |
| 2013-03-25 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-03-26 | Well Began Production |
| 2013-03-26 | Well Fluid changed to Crude Oil |
| 2013-03-26 | Well Mode changed to Flowing |
| 2013-03-29 | Well Log Performed |
| 2013-07-05 | Well Fluid changed to Crude Oil |
| 2013-07-05 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-02-05 | Savanna Drilling Corp. | 652 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-02-09 | 1477.30 | Deviate (5 - 79 degrees) |
| 2013-02-11 | 2230.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-02-21 | Open Hole/Barefoot Completion | 3695.00 | 3698.00 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3123.00 | 3123.10 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3052.10 | 3052.20 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2979.90 | 2980.00 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2909.30 | 2909.40 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2838.00 | 2838.10 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2769.20 | 2769.30 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2712.60 | 2712.70 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2640.30 | 2640.40 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2568.20 | 2568.30 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2497.00 | 2497.10 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3671.00 | 3671.10 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2437.90 | 2438.00 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 2363.60 | 2363.70 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3605.40 | 3605.50 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3534.50 | 3534.60 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3463.10 | 3463.20 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3392.50 | 3392.60 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3322.60 | 3322.70 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3252.20 | 3252.30 | 0 |
| 2013-03-25 | Multi-Stage Fracture | 3181.80 | 3181.90 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-03-25 | 2013-03-25 | 1,944 | 2,099 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 79.1218 | N/A | |||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.9409 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.7141 | N/A | ||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 3.7662 | N/A | ||
| Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0127 | N/A | |
| Water | 7732-18-5 | 100 | 0.0133 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.183 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0874 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0908 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0883 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.1056 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.0874 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.0893 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0908 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.343 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0626 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-03-25 | 2013-03-25 | Surface Water - Runoff | 1792 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 4810 | 0.0 | 0.0 | 0.0 |
| 2014 | 8495 | 0.0 | 0.0 | 0.0 |
| 2015 | 8147 | 0.0 | 0.0 | 0.0 |
| 2016 | 8397 | 0.0 | 0.0 | 0.0 |
| 2017 | 8521 | 0.0 | 0.0 | 0.0 |
| 2018 | 7626 | 0.0 | 0.0 | 0.0 |
| 2019 | 8519 | 0.0 | 0.0 | 0.0 |
| 2020 | 2087 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-02-21 | No Incident Encountered | 0.00 | 0.00 |
| 2013-03-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]