If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0325033413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.7786,"lon":-114.357061,"icon":""}]} |
| Location: 00/13-34-032-03W5/0 | |
| Location Alias: 00/13-34-32-03 W5M | |
| Location Alias 2: 00/13-34-032-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 032 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 34 | |
| County/Municipality: Mountain View County | |
| Well Name: RIDGEBACK HARME 13-34-32-3 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0455471 | |
| License Date: 2013-02-26 | |
| License Status: Issued | |
| Spud Date: 2013-03-08 | |
| Final Drill Date: 2013-03-17 | |
| Well Total Depth: 3582.00 m | |
| Surface Hole Latitude: 51.778600 | |
| Surface Hole Longitude: -114.357061 |
| Date | Event |
|---|---|
| 2013-02-26 | Obtained License |
| 2013-03-10 | Surface Casing Operation Performed |
| 2013-03-12 | Direction Drilling Operation Performed - Deviate |
| 2013-03-13 | Direction Drilling Operation Performed - Horizontal |
| 2013-03-17 | Finished Drilling |
| 2013-03-17 | Well Log Performed |
| 2013-03-17 | Well Mode changed to Drilled and Cased |
| 2013-03-19 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-03-19 | Production Casing Operation Performed |
| 2013-03-19 | Rig Released |
| 2013-04-08 | Well Log Performed |
| 2013-04-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-04-17 | Well Began Production |
| 2013-04-17 | Well Fluid changed to Crude Oil |
| 2013-04-17 | Well Mode changed to Flowing |
| 2013-04-26 | Well Log Performed |
| 2013-06-12 | Well Fluid changed to Crude Oil |
| 2013-06-12 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-03-08 | Savanna Drilling Corp. | 652E | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-03-12 | 1557.90 | Deviate (5 - 79 degrees) |
| 2013-03-13 | 2139.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-03-19 | Open Hole/Barefoot Completion | 3579.00 | 3582.00 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3003.20 | 3003.30 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2942.00 | 2942.10 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2880.80 | 2880.90 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2805.40 | 2805.50 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2744.20 | 2744.30 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2668.80 | 2668.90 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2607.50 | 2607.60 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2533.40 | 2533.50 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2472.20 | 2472.30 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2396.80 | 2396.90 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3553.60 | 3553.70 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2336.10 | 2336.20 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 2259.10 | 2259.20 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3485.70 | 3485.80 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3412.60 | 3412.70 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3351.50 | 3351.60 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3276.10 | 3276.20 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3215.00 | 3215.10 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3139.70 | 3139.80 | 0 |
| 2013-04-16 | Multi-Stage Fracture | 3078.50 | 3078.60 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-04-16 | 2013-04-16 | 1,928 | 2,348 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 80.2714 | N/A | |||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 7.2683 | N/A | ||
| 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.3736 | N/A | ||
| 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 3.1852 | N/A | ||
| Tolcide PS75LT | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0126 | N/A | |
| Water | 7732-18-5 | 100 | 0.0134 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.185 | N/A | |
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0854 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0879 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0858 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.1003 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.0854 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.087 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0879 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 5.468 | N/A | |
| DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0633 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-04-16 | 2013-04-16 | Surface Water - Runoff | 2400 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 5596 | 0.0 | 0.0 | 0.0 |
| 2014 | 8579 | 0.0 | 0.0 | 0.0 |
| 2015 | 8153 | 0.0 | 0.0 | 0.0 |
| 2016 | 8495 | 0.0 | 0.0 | 0.0 |
| 2017 | 8500 | 0.0 | 0.0 | 0.0 |
| 2018 | 7827 | 0.0 | 0.0 | 0.0 |
| 2019 | 8483 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-03-19 | No Incident Encountered | 0.00 | 0.00 |
| 2013-04-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]