X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325033516030

Well Details

Well ID: 0325033516030
Loading map...
Location: 03/16-35-032-03W5/0
Location Alias: 03/16-35-32-03 W5M
Location Alias 2: 03/16-35-032-03 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 03
Section: 35
County/Municipality: Mountain View County
Well Name: NAL HARME 16-35-32-3
Operator Name: NAL Resources Limited
License Number: 0445963
License Date: 2012-05-17
License Status: Amended
Spud Date: 2012-06-07
Final Drill Date: 2012-07-04
Well Total Depth: 3752.00 m
Surface Hole Latitude: 51.796054
Surface Hole Longitude: -114.335436

For data sources see[1][2]

Well History

Date Event
2012-05-17 Obtained License
2012-06-09 Surface Casing Operation Performed
2012-06-13 Direction Drilling Operation Performed - Horizontal
2012-06-14 Well Log Performed
2012-06-21 Intermediate Casing Operation Performed
2012-07-04 Finished Drilling
2012-07-04 Liner Casing Operation Performed
2012-07-04 Perforation Treatment Performed - Open-Hole Completion
2012-07-04 Well Mode changed to Drilled and Cased
2012-07-08 Rig Released
2012-08-20 Well Log Performed
2012-08-21 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-12 Well Began Production
2012-09-12 Well Fluid changed to Gas
2012-09-12 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-07 Savanna Drilling Corp. 624 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-13 1857.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-04 Open Hole/Barefoot Completion 3749.00 3752.00 0
2012-08-21 Multi-Stage Fracture 2967.40 2967.50 0
2012-08-21 Multi-Stage Fracture 2893.20 2893.30 0
2012-08-21 Multi-Stage Fracture 2808.40 2808.50 0
2012-08-21 Multi-Stage Fracture 3730.20 3730.30 0
2012-08-21 Multi-Stage Fracture 3661.10 3661.20 0
2012-08-21 Multi-Stage Fracture 3491.50 3491.60 0
2012-08-21 Multi-Stage Fracture 3392.00 3392.10 0
2012-08-21 Multi-Stage Fracture 3296.80 3296.90 0
2012-08-21 Multi-Stage Fracture 3212.00 3212.10 0
2012-08-21 Multi-Stage Fracture 3115.80 3115.90 0
2012-08-21 Multi-Stage Fracture 3053.00 3053.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2655 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8694 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8755 0.0 0.0 0.0
2018 8711 0.0 0.0 0.0
2019 8496 0.0 0.0 0.0
2020 2027 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-08 No Incident Encountered 0.00 0.00
2012-08-17 No Incident Encountered 0.00 0.00

For data sources see[8]

References