X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0325041409000

Well Details

Well ID: 0325041409000
Loading map...
Location: 00/09-14-032-04W5/0
Location Alias: 00/09-14-32-04 W5M
Location Alias 2: 00/09-14-032-04 W5/00
Country: Canada
Province: Alberta
Township: 032
Meridian: 5
Range: 04
Section: 14
County/Municipality: Mountain View County
Well Name: MOBIL UNIT HARME 9-14-32-4
Operator Name: ExxonMobil Canada Ltd.
License Number: 0015116
License Date: 1958-04-29
License Status: Issued
Spud Date: 1958-05-07
Final Drill Date: 1958-06-09
Well Total Depth: 2660.00 m
Surface Hole Latitude: 51.745941
Surface Hole Longitude: -114.453545

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-04-29 Obtained License
1958-06-09 Finished Drilling
1958-06-09 Well Mode changed to Drilled and Cased
1958-06-11 Production Casing Operation Performed
1958-06-24 Perforation Treatment Performed - Jet Perforation
1958-06-24 Perforation Treatment Performed - Open-Hole Completion
1958-06-24 Well Began Production
1958-06-24 Well Fluid changed to Crude Oil
1958-06-24 Well Mode changed to Flowing
1975-11-17 Well Fluid changed to Crude Oil
1975-11-17 Well Mode changed to Gas Lift
1990-12-17 Well Log Performed
1991-11-27 Well Log Performed
1995-05-04 Well Log Performed
1998-05-05 Well Fluid changed to Crude Oil
1998-05-05 Well Mode changed to Suspended
2002-11-22 Well Fluid changed to Crude Oil
2002-11-22 Well Mode changed to Gas Lift
2012-01-28 Well Fluid changed to Crude Oil
2012-01-28 Well Mode changed to Pumping
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Suspended
2016-09-01 Well Fluid changed to Crude Oil
2016-09-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-06-24 Perforation 2633.50 2636.50 13
1958-06-24 Open Hole/Barefoot Completion 2639.60 2660.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 162 0.0 0.0 0.0
1970 648 0.0 0.0 0.0
1971 5914 0.0 0.0 0.0
1972 2731 0.0 0.0 0.0
1973 6785 0.0 0.0 0.0
1974 4839 0.0 0.0 0.0
1975 6160 0.0 0.0 0.0
1976 3736 0.0 0.0 0.0
1977 6918 0.0 0.0 0.0
1978 4353 0.0 0.0 0.0
1979 7331 0.0 0.0 0.0
1980 8287 0.0 0.0 0.0
1981 7888 0.0 0.0 0.0
1982 7708 0.0 0.0 0.0
1983 8177 0.0 0.0 0.0
1984 7504 0.0 0.0 0.0
1985 6547 0.0 0.0 0.0
1986 3103 0.0 0.0 0.0
1988 4013 0.0 0.0 0.0
1989 3916 0.0 0.0 0.0
1990 7614 0.0 0.0 0.0
1991 8360 0.0 0.0 0.0
1992 7593 0.0 0.0 0.0
1993 7827 0.0 0.0 0.0
1994 7814 0.0 0.0 0.0
1995 4218 0.0 0.0 0.0
1997 923 0.0 0.0 0.0
2002 866 0.0 0.0 0.0
2003 7956 0.0 0.0 0.0
2004 7976 0.0 0.0 0.0
2005 7619 0.0 0.0 0.0
2006 6383 0.0 0.0 0.0
2007 7992 0.0 0.0 0.0
2008 6748 0.0 0.0 0.0
2009 7201 0.0 0.0 0.0
2010 3814 0.0 0.0 0.0
2011 7782 0.0 0.0 0.0
2012 6518 0.0 0.0 0.0
2013 4825 0.0 0.0 0.0
2014 6921 0.0 0.0 0.0
2015 1303 0.0 0.0 0.0
2016 432 0.0 0.0 0.0
2017 8075 0.0 0.0 0.0
2018 6698 0.0 0.0 0.0
2019 7161 0.0 0.0 0.0
2020 2133 0.0 0.0 0.0

For data sources see[5]

References