X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334101805004

Well Details

Well ID: 0334101805004
Loading map...
Location: 00/05-18-033-10W4/4
Location Alias: 00/05-18-33-10 W4M
Location Alias 2: 00/05-18-033-10 W4/04
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 10
Section: 18
County/Municipality: Special Areas No. 2
Well Name: TUDOR PROVO 5-18-33-10
Operator Name: Tudor Corporation Ltd.
License Number: 0331073
License Date: 2005-05-16
License Status: Amended
Spud Date: 2005-07-01
Final Drill Date: 2005-07-03
Well Total Depth: 1094.00 m
Surface Hole Latitude: 51.827460
Surface Hole Longitude: -111.417241

For data sources see[1][2]

Well History

Date Event
2005-05-16 Obtained License
2005-05-31 Surface Casing Operation Performed
2005-07-03 Finished Drilling
2005-07-03 Production Casing Operation Performed
2005-07-03 Rig Released
2005-07-03 Well Log Performed
2005-07-03 Well Mode changed to Drilled and Cased
2005-07-14 Perforation Treatment Performed - Jet Perforation
2005-07-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-21 Plug Back Performed
2005-07-22 Perforation Treatment Performed - Jet Perforation
2005-08-02 Perforation Treatment Performed - Fractured
2005-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-10 Plug Back Performed
2005-08-11 Perforation Treatment Performed - Fractured
2005-08-11 Perforation Treatment Performed - Jet Perforation
2005-08-14 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-08-15 Perforation Treatment Performed - Fractured
2005-08-15 Perforation Treatment Performed - Jet Perforation
2005-08-16 Perforation Treatment Performed - Fractured
2005-08-16 Perforation Treatment Performed - Jet Perforation
2005-12-17 Well Began Production
2005-12-17 Well Fluid changed to Gas
2005-12-17 Well Mode changed to Flowing
2007-10-23 Well Fluid changed to Gas
2007-10-23 Well Mode changed to Suspended
2018-10-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-14 Perforation 1078.50 1083.00 17
2005-08-15 Fracture 891.00 902.00 0
2005-08-16 Perforation 757.00 760.00 17
2005-08-16 Fracture 757.00 760.00 0
2005-07-21 Packing Device Capped w/Cement 1065.00 1073.00 0
2005-07-22 Perforation 1031.00 1042.50 17
2005-08-02 Fracture 1031.00 1042.50 0
2005-08-10 Packing Device Capped w/Cement 1012.00 1020.00 0
2005-08-11 Perforation 943.00 945.00 17
2005-08-11 Fracture 943.00 945.00 0
2005-08-14 Bridge Plug, No Cement 919.00 920.00 0
2005-08-15 Perforation 891.00 902.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 28 0.0 0.0 0.0
2006 2163 0.0 0.0 0.0
2007 851 0.0 0.0 0.0

For data sources see[5]

References