X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334111505004

Well Details

Well ID: 0334111505004
Loading map...
Location: 00/05-15-033-11W4/4
Location Alias: 00/05-15-33-11 W4M
Location Alias 2: 00/05-15-033-11 W4/04
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 11
Section: 15
County/Municipality: Special Areas No. 2
Well Name: TUDOR PROVO 5-15-33-11
Operator Name: Tudor Corporation Ltd.
License Number: 0330792
License Date: 2005-05-11
License Status: Abandoned
Spud Date: 2005-06-25
Final Drill Date: 2005-06-26
Well Total Depth: 1091.00 m
Surface Hole Latitude: 51.830440
Surface Hole Longitude: -111.488118

For data sources see[1][2]

Well History

Date Event
2005-05-11 Obtained License
2005-05-16 Surface Casing Operation Performed
2005-06-26 Finished Drilling
2005-06-26 Production Casing Operation Performed
2005-06-26 Rig Released
2005-06-26 Well Log Performed
2005-06-26 Well Mode changed to Drilled and Cased
2005-07-03 Perforation Treatment Performed - Jet Perforation
2005-07-11 Perforation Treatment Performed - Fractured
2005-07-15 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-16 Perforation Treatment Performed - Jet Perforation
2005-07-16 Plug Back Performed
2005-07-20 Perforation Treatment Performed - Fractured
2005-07-29 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-07-29 Perforation Treatment Performed - Jet Perforation
2005-07-30 Perforation Treatment Performed - Fractured
2005-08-07 Perforation Treatment Performed - Bridge Plug No Cement Required
2005-08-07 Perforation Treatment Performed - Jet Perforation
2005-08-08 Perforation Treatment Performed - Fractured
2005-10-01 Well Began Production
2005-10-01 Well Fluid changed to Gas
2005-10-01 Well Mode changed to Flowing
2007-04-30 Well Fluid changed to Gas
2007-04-30 Well Mode changed to Suspended
2016-11-18 Perforation Treatment Performed - Cement Plug
2016-11-18 Perforation Treatment Performed - Cement Squeeze
2016-11-18 Plug Back Performed
2016-11-18 Well Fluid changed to Gas
2016-11-18 Well Mode changed to Abandoned Zone
2016-11-28 Well Abandoned
2016-11-28 Well Fluid changed to Gas
2016-11-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-03 Perforation 1058.00 1063.00 17
2005-08-07 Bridge Plug, No Cement 969.00 970.00 0
2005-08-07 Perforation 962.00 964.00 17
2005-08-08 Fracture 962.00 964.00 0
2016-11-18 Cement Squeeze 1020.00 1023.00 0
2016-11-18 Cement Squeeze 974.50 977.00 0
2016-11-18 Cement Squeeze 962.00 964.00 0
2016-11-18 Cement Plug 757.00 1039.00 0
2005-07-11 Fracture 1058.00 1063.00 0
2005-07-15 Bridge Plug, No Cement 1046.00 1047.00 0
2005-07-16 Packing Device Capped w/Cement 1038.00 1046.00 0
2005-07-16 Perforation 1020.00 1023.00 17
2005-07-20 Fracture 1020.00 1023.00 0
2005-07-29 Bridge Plug, No Cement 1017.00 1018.00 0
2005-07-29 Perforation 974.50 977.00 17
2005-07-30 Fracture 974.50 977.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1309 0.0 0.0 0.0
2006 4318 0.0 0.0 0.0
2007 513 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References