X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334170906020

Well Details

Well ID: 0334170906020
Loading map...
Location: 02/06-09-033-17W4/0
Location Alias: 02/06-09-33-17 W4M
Location Alias 2: 02/06-09-033-17 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 17
Section: 09
County/Municipality: Starland County
Well Name: TEAC CHAIN 6-9-33-17
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0354718
License Date: 2006-03-24
License Status: Issued
Spud Date: 2006-06-28
Final Drill Date: 2006-06-28
Well Total Depth: 380.00 m
Surface Hole Latitude: 51.815924
Surface Hole Longitude: -112.360667

For data sources see[1][2]

Well History

Date Event
2006-03-24 Obtained License
2006-05-18 Surface Casing Operation Performed
2006-06-28 Finished Drilling
2006-06-28 Production Casing Operation Performed
2006-06-28 Rig Released
2006-06-28 Well Mode changed to Drilled and Cased
2006-07-06 Well Log Performed
2006-08-31 Perforation Treatment Performed - Jet Perforation
2006-08-31 Well Log Performed
2006-09-12 Perforation Treatment Performed - Fractured
2006-10-20 Well Began Production
2006-10-20 Well Fluid changed to Coalbed Methane-Coals and Other
2006-10-20 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-08-31 Perforation 291.10 291.60 13
2006-08-31 Perforation 167.40 168.40 7
2006-08-31 Perforation 162.30 163.30 7
2006-08-31 Perforation 157.80 158.80 7
2006-08-31 Perforation 151.30 153.80 7
2006-08-31 Perforation 146.80 147.30 13
2006-08-31 Perforation 143.60 145.10 7
2006-08-31 Perforation 141.50 142.50 7
2006-08-31 Perforation 138.00 138.50 13
2006-08-31 Perforation 124.10 124.60 13
2006-08-31 Perforation 120.00 121.00 7
2006-08-31 Perforation 266.50 267.50 7
2006-08-31 Perforation 116.10 117.10 7
2006-08-31 Perforation 112.20 113.70 7
2006-08-31 Perforation 103.40 103.90 13
2006-09-12 Fracture 291.10 291.60 0
2006-09-12 Fracture 266.50 267.50 0
2006-09-12 Fracture 261.20 261.70 0
2006-09-12 Fracture 254.80 258.80 0
2006-09-12 Fracture 207.90 208.40 0
2006-09-12 Fracture 185.00 186.00 0
2006-09-12 Fracture 180.30 183.80 0
2006-08-31 Perforation 261.20 261.70 13
2006-09-12 Fracture 175.70 178.70 0
2006-09-12 Fracture 170.10 170.60 0
2006-09-12 Fracture 167.40 168.40 0
2006-09-12 Fracture 162.30 163.30 0
2006-09-12 Fracture 157.80 158.80 0
2006-09-12 Fracture 151.30 153.80 0
2006-09-12 Fracture 146.80 147.30 0
2006-09-12 Fracture 141.50 145.10 0
2006-09-12 Fracture 138.00 138.50 0
2006-09-12 Fracture 124.10 124.60 0
2006-08-31 Perforation 254.80 258.80 7
2006-09-12 Fracture 120.00 121.00 0
2006-09-12 Fracture 116.10 117.10 0
2006-09-12 Fracture 112.20 113.70 0
2006-09-12 Fracture 103.40 103.90 0
2006-08-31 Perforation 207.90 208.40 13
2006-08-31 Perforation 185.00 186.00 7
2006-08-31 Perforation 180.30 183.80 7
2006-08-31 Perforation 175.70 178.70 7
2006-08-31 Perforation 170.10 170.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 1652 0.0 0.0 0.0
2007 8710 0.0 0.0 0.0
2008 8664 0.0 0.0 0.0
2009 8586 0.0 0.0 0.0
2010 8729 0.0 0.0 0.0
2011 8626 0.0 0.0 0.0
2012 8636 0.0 0.0 0.0
2013 8635 0.0 0.0 0.0
2014 8656 0.0 0.0 0.0
2015 8049 0.0 0.0 0.0
2016 8703 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References