X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334171806000

Well Details

Well ID: 0334171806000
Loading map...
Location: 00/06-18-033-17W4/0
Location Alias: 00/06-18-33-17 W4M
Location Alias 2: 00/06-18-033-17 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 17
Section: 18
County/Municipality: Starland County
Well Name: TEAC CHAIN 6-18-33-17
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0355841
License Date: 2006-04-20
License Status: Issued
Spud Date: 2006-07-03
Final Drill Date: 2006-07-03
Well Total Depth: 626.00 m
Surface Hole Latitude: 51.827453
Surface Hole Longitude: -112.407275

For data sources see[1][2]

Well History

Date Event
2006-04-20 Obtained License
2006-06-05 Surface Casing Operation Performed
2006-07-03 Finished Drilling
2006-07-03 Well Mode changed to Drilled and Cased
2006-07-04 Production Casing Operation Performed
2006-07-04 Rig Released
2006-07-12 Well Log Performed
2006-10-16 Perforation Treatment Performed - Jet Perforation
2006-10-16 Well Log Performed
2006-12-10 Perforation Treatment Performed - Fractured
2007-03-08 Well Began Production
2007-03-08 Well Fluid changed to Coalbed Methane-Coals and Other
2007-03-08 Well Mode changed to Flowing
2017-12-09 Perforation Treatment Performed - Jet Perforation
2018-01-28 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-10-16 Perforation 337.30 337.80 13
2006-10-16 Perforation 163.00 164.00 7
2006-10-16 Perforation 155.60 156.60 7
2006-10-16 Perforation 150.80 151.80 7
2006-10-16 Perforation 149.00 149.50 13
2006-10-16 Perforation 146.00 148.00 7
2006-10-16 Perforation 137.60 138.10 13
2006-10-16 Perforation 134.50 135.50 7
2006-10-16 Perforation 116.50 117.50 7
2006-10-16 Perforation 112.70 114.20 7
2006-10-16 Perforation 110.40 110.90 13
2006-10-16 Perforation 320.10 321.10 7
2006-10-16 Perforation 101.00 103.50 7
2006-10-16 Perforation 94.30 94.80 13
2006-10-16 Perforation 89.60 90.60 7
2006-12-10 Fracture 337.30 337.80 0
2006-12-10 Fracture 320.10 321.10 0
2006-12-10 Fracture 287.80 288.30 0
2006-12-10 Fracture 270.20 270.70 0
2006-12-10 Fracture 262.90 264.90 0
2006-12-10 Fracture 222.10 222.60 0
2006-12-10 Fracture 203.00 203.50 0
2006-10-16 Perforation 287.80 288.30 13
2006-12-10 Fracture 173.40 175.40 0
2006-12-10 Fracture 165.00 166.00 0
2006-12-10 Fracture 163.00 164.00 0
2006-12-10 Fracture 155.60 156.60 0
2006-12-10 Fracture 149.00 151.80 0
2006-12-10 Fracture 146.00 148.00 0
2006-12-10 Fracture 137.60 138.10 0
2006-12-10 Fracture 134.50 135.50 0
2006-12-10 Fracture 116.50 117.50 0
2006-12-10 Fracture 112.70 114.20 0
2006-10-16 Perforation 270.20 270.70 13
2006-12-10 Fracture 110.40 110.90 0
2006-12-10 Fracture 101.00 103.50 0
2006-12-10 Fracture 94.30 94.80 0
2006-12-10 Fracture 89.60 90.60 0
2017-12-09 Perforation 587.00 591.00 13
2017-12-09 Perforation 573.00 576.00 13
2017-12-09 Perforation 570.00 571.00 13
2017-12-09 Perforation 566.00 566.50 13
2017-12-09 Perforation 554.50 555.50 13
2017-12-09 Perforation 553.00 554.00 13
2006-10-16 Perforation 262.90 264.90 7
2017-12-09 Perforation 466.00 466.50 13
2017-12-09 Perforation 461.50 462.50 13
2017-12-09 Perforation 440.00 440.50 13
2017-12-09 Perforation 436.50 437.50 13
2017-12-09 Perforation 431.00 431.50 13
2017-12-09 Perforation 428.00 428.50 13
2018-01-28 Fracture 428.00 591.00 0
2006-10-16 Perforation 222.10 222.60 13
2006-10-16 Perforation 203.00 203.50 13
2006-10-16 Perforation 173.40 175.40 7
2006-10-16 Perforation 165.00 166.00 7

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-28 2018-01-28 0 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen 7727-37-9 100 100 N/A

For data sources see[5]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 6937 0.0 0.0 0.0
2008 8654 0.0 0.0 0.0
2009 8584 0.0 0.0 0.0
2010 8628 0.0 0.0 0.0
2011 8591 0.0 0.0 0.0
2012 8671 0.0 0.0 0.0
2013 8623 0.0 0.0 0.0
2014 7685 0.0 0.0 0.0
2015 7442 0.0 0.0 0.0
2016 8374 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 7295 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-09 No Incident Encountered 0.00 0.00
2018-01-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References