If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334180106020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.801369,"lon":-112.431355,"icon":""}]} |
Location: 02/06-01-033-18W4/0 | |
Location Alias: 02/06-01-33-18 W4M | |
Location Alias 2: 02/06-01-033-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 18 | |
Section: 01 | |
County/Municipality: Starland County | |
Well Name: TEAC CRAIGML 6-1-33-18 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0353949 | |
License Date: 2006-03-13 | |
License Status: Issued | |
Spud Date: 2006-06-30 | |
Final Drill Date: 2006-06-30 | |
Well Total Depth: 624.00 m | |
Surface Hole Latitude: 51.801369 | |
Surface Hole Longitude: -112.431355 |
Date | Event |
---|---|
2006-03-13 | Obtained License |
2006-05-25 | Surface Casing Operation Performed |
2006-06-30 | Finished Drilling |
2006-06-30 | Well Mode changed to Drilled and Cased |
2006-07-01 | Production Casing Operation Performed |
2006-07-01 | Rig Released |
2006-07-10 | Well Log Performed |
2006-10-31 | Perforation Treatment Performed - Jet Perforation |
2006-10-31 | Well Log Performed |
2006-12-09 | Perforation Treatment Performed - Fractured |
2006-12-27 | Well Began Production |
2006-12-27 | Well Fluid changed to Coalbed Methane-Coals and Other |
2006-12-27 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-10-31 | Perforation | 352.20 | 353.70 | 7 |
2006-10-31 | Perforation | 184.50 | 185.50 | 7 |
2006-10-31 | Perforation | 181.70 | 183.70 | 13 |
2006-10-31 | Perforation | 179.30 | 180.80 | 7 |
2006-10-31 | Perforation | 175.50 | 176.00 | 13 |
2006-10-31 | Perforation | 173.50 | 174.00 | 13 |
2006-10-31 | Perforation | 165.00 | 166.00 | 7 |
2006-10-31 | Perforation | 159.50 | 160.00 | 13 |
2006-10-31 | Perforation | 157.00 | 157.50 | 13 |
2006-10-31 | Perforation | 153.00 | 154.00 | 7 |
2006-10-31 | Perforation | 151.60 | 152.10 | 7 |
2006-10-31 | Perforation | 346.00 | 346.50 | 13 |
2006-10-31 | Perforation | 142.70 | 143.70 | 7 |
2006-10-31 | Perforation | 122.60 | 123.60 | 7 |
2006-10-31 | Perforation | 120.10 | 120.60 | 13 |
2006-10-31 | Perforation | 114.00 | 114.50 | 7 |
2006-10-31 | Perforation | 111.20 | 113.20 | 7 |
2006-10-31 | Perforation | 107.00 | 110.00 | 13 |
2006-10-31 | Perforation | 103.70 | 104.70 | 13 |
2006-10-31 | Perforation | 101.30 | 101.80 | 7 |
2006-10-31 | Perforation | 95.50 | 96.00 | 13 |
2006-10-31 | Perforation | 89.00 | 91.00 | 7 |
2006-10-31 | Perforation | 331.00 | 332.00 | 13 |
2006-12-09 | Fracture | 352.20 | 353.70 | 0 |
2006-12-09 | Fracture | 346.00 | 346.50 | 0 |
2006-12-09 | Fracture | 331.00 | 332.00 | 0 |
2006-12-09 | Fracture | 297.70 | 298.20 | 0 |
2006-12-09 | Fracture | 280.00 | 280.50 | 0 |
2006-12-09 | Fracture | 273.70 | 275.20 | 0 |
2006-12-09 | Fracture | 231.00 | 232.00 | 0 |
2006-12-09 | Fracture | 224.50 | 225.00 | 0 |
2006-12-09 | Fracture | 187.00 | 190.00 | 0 |
2006-12-09 | Fracture | 181.70 | 185.50 | 0 |
2006-10-31 | Perforation | 297.70 | 298.20 | 7 |
2006-12-09 | Fracture | 179.30 | 180.80 | 0 |
2006-12-09 | Fracture | 173.50 | 176.00 | 0 |
2006-12-09 | Fracture | 165.00 | 166.00 | 0 |
2006-12-09 | Fracture | 157.00 | 160.00 | 0 |
2006-12-09 | Fracture | 151.60 | 154.00 | 0 |
2006-12-09 | Fracture | 142.70 | 143.70 | 0 |
2006-12-09 | Fracture | 122.60 | 123.60 | 0 |
2006-12-09 | Fracture | 120.10 | 120.60 | 0 |
2006-12-09 | Fracture | 111.20 | 114.50 | 0 |
2006-12-09 | Fracture | 107.00 | 110.00 | 0 |
2006-10-31 | Perforation | 280.00 | 280.50 | 7 |
2006-12-09 | Fracture | 101.30 | 104.70 | 0 |
2006-12-09 | Fracture | 95.50 | 96.00 | 0 |
2006-12-09 | Fracture | 89.00 | 91.00 | 0 |
2006-10-31 | Perforation | 273.70 | 275.20 | 7 |
2006-10-31 | Perforation | 231.00 | 232.00 | 13 |
2006-10-31 | Perforation | 224.50 | 225.00 | 13 |
2006-10-31 | Perforation | 187.00 | 190.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 24 | 0.0 | 0.0 | 0.0 |
2007 | 8518 | 0.0 | 0.0 | 0.0 |
2008 | 8687 | 0.0 | 0.0 | 0.0 |
2009 | 8632 | 0.0 | 0.0 | 0.0 |
2010 | 8632 | 0.0 | 0.0 | 0.0 |
2011 | 8607 | 0.0 | 0.0 | 0.0 |
2012 | 8639 | 0.0 | 0.0 | 0.0 |
2013 | 8412 | 0.0 | 0.0 | 0.0 |
2014 | 8333 | 0.0 | 0.0 | 0.0 |
2015 | 8017 | 0.0 | 0.0 | 0.0 |
2016 | 8615 | 0.0 | 0.0 | 0.0 |
2017 | 8711 | 0.0 | 0.0 | 0.0 |
2018 | 8715 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]