X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334201804020

Well Details

Well ID: 0334201804020
Loading map...
Location: 02/04-18-033-20W4/0
Location Alias: 02/04-18-33-20 W4M
Location Alias 2: 02/04-18-033-20 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 20
Section: 18
County/Municipality: Starland County
Well Name: 981384 ROWLEY 4-18-33-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0433681
License Date: 2011-05-19
License Status: Issued
Spud Date: 2011-07-18
Final Drill Date: 2011-07-20
Well Total Depth: 408.00 m
Surface Hole Latitude: 51.826607
Surface Hole Longitude: -112.834531

For data sources see[1][2]

Well History

Date Event
2011-05-19 Obtained License
2011-07-18 Surface Casing Operation Performed
2011-07-19 Production Casing Operation Performed
2011-07-20 Finished Drilling
2011-07-20 Rig Released
2011-07-20 Well Mode changed to Drilled and Cased
2011-09-12 Well Log Performed
2011-10-29 Perforation Treatment Performed - Jet Perforation
2011-10-29 Well Log Performed
2012-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-07 Well Began Production
2012-01-07 Well Fluid changed to Coalbed Methane-Coals Only
2012-01-07 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-29 Perforation 389.50 390.00 13
2011-10-29 Perforation 256.60 257.00 13
2011-10-29 Perforation 255.30 256.20 13
2011-10-29 Perforation 253.20 254.00 13
2011-10-29 Perforation 242.30 242.70 13
2011-10-29 Perforation 235.90 236.40 13
2011-10-29 Perforation 232.40 232.70 13
2011-10-29 Perforation 230.20 230.70 13
2012-01-05 Multi-Stage Fracture 385.90 392.00 0
2012-01-05 Multi-Stage Fracture 328.90 335.00 0
2012-01-05 Multi-Stage Fracture 316.90 323.00 0
2011-10-29 Perforation 333.00 333.90 13
2012-01-05 Multi-Stage Fracture 22.90 289.00 0
2012-01-05 Multi-Stage Fracture 274.90 281.00 0
2012-01-05 Multi-Stage Fracture 265.90 272.00 0
2012-01-05 Multi-Stage Fracture 258.90 265.00 0
2012-01-05 Multi-Stage Fracture 251.90 258.00 0
2012-01-05 Multi-Stage Fracture 237.90 244.00 0
2012-01-05 Multi-Stage Fracture 233.90 240.00 0
2012-01-05 Multi-Stage Fracture 227.90 234.00 0
2012-01-05 Multi-Stage Fracture 282.90 289.00 0
2011-10-29 Perforation 320.60 321.40 13
2011-10-29 Perforation 286.00 286.70 13
2011-10-29 Perforation 285.20 285.50 13
2011-10-29 Perforation 279.30 279.80 13
2011-10-29 Perforation 269.80 270.50 13
2011-10-29 Perforation 262.60 263.10 13
2011-10-29 Perforation 261.30 261.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8639 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 2879 0.0 0.0 0.0

For data sources see[5]

References