If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334201804020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/04-18-033-20W4/0 | |
Location Alias: 02/04-18-33-20 W4M | |
Location Alias 2: 02/04-18-033-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 20 | |
Section: 18 | |
County/Municipality: Starland County | |
Well Name: 981384 ROWLEY 4-18-33-20 | |
Operator Name: Trident Exploration (Alberta) Corp. | |
License Number: 0433681 | |
License Date: 2011-05-19 | |
License Status: Issued | |
Spud Date: 2011-07-18 | |
Final Drill Date: 2011-07-20 | |
Well Total Depth: 408.00 m | |
Surface Hole Latitude: 51.826607 | |
Surface Hole Longitude: -112.834531 |
Date | Event |
---|---|
2011-05-19 | Obtained License |
2011-07-18 | Surface Casing Operation Performed |
2011-07-19 | Production Casing Operation Performed |
2011-07-20 | Finished Drilling |
2011-07-20 | Rig Released |
2011-07-20 | Well Mode changed to Drilled and Cased |
2011-09-12 | Well Log Performed |
2011-10-29 | Perforation Treatment Performed - Jet Perforation |
2011-10-29 | Well Log Performed |
2012-01-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-07 | Well Began Production |
2012-01-07 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-01-07 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-29 | Perforation | 389.50 | 390.00 | 13 |
2011-10-29 | Perforation | 256.60 | 257.00 | 13 |
2011-10-29 | Perforation | 255.30 | 256.20 | 13 |
2011-10-29 | Perforation | 253.20 | 254.00 | 13 |
2011-10-29 | Perforation | 242.30 | 242.70 | 13 |
2011-10-29 | Perforation | 235.90 | 236.40 | 13 |
2011-10-29 | Perforation | 232.40 | 232.70 | 13 |
2011-10-29 | Perforation | 230.20 | 230.70 | 13 |
2012-01-05 | Multi-Stage Fracture | 385.90 | 392.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 328.90 | 335.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 316.90 | 323.00 | 0 |
2011-10-29 | Perforation | 333.00 | 333.90 | 13 |
2012-01-05 | Multi-Stage Fracture | 22.90 | 289.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 274.90 | 281.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 265.90 | 272.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 258.90 | 265.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 251.90 | 258.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 237.90 | 244.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 233.90 | 240.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 227.90 | 234.00 | 0 |
2012-01-05 | Multi-Stage Fracture | 282.90 | 289.00 | 0 |
2011-10-29 | Perforation | 320.60 | 321.40 | 13 |
2011-10-29 | Perforation | 286.00 | 286.70 | 13 |
2011-10-29 | Perforation | 285.20 | 285.50 | 13 |
2011-10-29 | Perforation | 279.30 | 279.80 | 13 |
2011-10-29 | Perforation | 269.80 | 270.50 | 13 |
2011-10-29 | Perforation | 262.60 | 263.10 | 13 |
2011-10-29 | Perforation | 261.30 | 261.70 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 8639 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
For data sources see[5]