X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334202201000

Well Details

Well ID: 0334202201000
Loading map...
Location: 00/01-22-033-20W4/0
Location Alias: 00/01-22-33-20 W4M
Location Alias 2: 00/01-22-033-20 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 20
Section: 22
County/Municipality: Starland County
Well Name: TEAC ROWLEY 1-22-33-20
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0126555
License Date: 1987-05-21
License Status: Suspension
Spud Date: 1987-06-01
Final Drill Date: 1987-06-05
Well Total Depth: 1418.00 m
Surface Hole Latitude: 51.841070
Surface Hole Longitude: -112.750137

For data sources see[1][2]

Well History

Date Event
1987-05-21 Obtained License
1987-06-02 Surface Casing Operation Performed
1987-06-05 Finished Drilling
1987-06-05 Well Log Performed
1987-06-06 Drill Stem Test Performed
1987-06-07 Production Casing Operation Performed
1987-06-07 Rig Released
1987-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-06-10 Perforation Treatment Performed - Jet Perforation
1987-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-06-11 Perforation Treatment Performed - Jet Perforation
1987-06-11 Plug Back Performed
1987-06-12 Perforation Treatment Performed - Fractured
1987-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-06-16 Perforation Treatment Performed - Fractured
1987-06-16 Perforation Treatment Performed - Jet Perforation
1987-06-16 Plug Back Performed
1987-07-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-07-23 Perforation Treatment Performed - Jet Perforation
1987-07-23 Plug Back Performed
1987-07-23 Well Mode changed to Drilled and Cased
1993-02-02 Well Began Production
1993-02-02 Well Fluid changed to Gas
1993-02-02 Well Mode changed to Flowing
1994-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-02 Perforation Treatment Performed - Jet Perforation
1994-10-02 Plug Back Performed
1994-10-02 Well Fluid changed to Gas
1994-10-02 Well Mode changed to Abandoned Zone
1994-10-03 Perforation Treatment Performed - Fractured
1999-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-08 Perforation Treatment Performed - Jet Perforation
1999-11-08 Plug Back Performed
1999-11-09 Perforation Treatment Performed - Fractured
2000-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-15 Perforation Treatment Performed - Jet Perforation
2000-05-15 Plug Back Performed
2000-05-16 Perforation Treatment Performed - Remedial Casing
2000-05-18 Perforation Treatment Performed - Jet Perforation
2000-05-18 Well Log Performed
2000-05-19 Perforation Treatment Performed - Jet Perforation
2000-07-04 Perforation Treatment Performed - Cement Squeeze
2000-07-04 Perforation Treatment Performed - Jet Perforation
2000-07-07 Perforation Treatment Performed - Jet Perforation
2000-07-07 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-06-10 Perforation 1402.00 1404.00 13
1987-06-16 Fracture 1325.00 1334.00 0
1987-07-23 Packing Device Capped w/Cement 1312.00 1320.00 0
1987-07-23 Perforation 1175.00 1177.00 13
1994-10-02 Packing Device Capped w/Cement 1162.00 1170.00 0
1994-10-02 Perforation 618.00 622.00 13
1994-10-03 Fracture 618.00 622.00 0
1999-11-08 Packing Device Capped w/Cement 607.00 615.00 0
1999-11-08 Perforation 552.00 556.00 13
1999-11-09 Fracture 552.00 556.00 0
2000-05-15 Packing Device Capped w/Cement 542.00 550.00 0
1987-06-10 Acid Treatment 1402.00 1404.00 0
2000-05-15 Perforation 315.00 316.00 14
2000-05-16 Remedial Casing Cementing 315.00 316.00 0
2000-05-18 Perforation 322.00 323.00 14
2000-05-19 Perforation 298.00 300.00 14
2000-07-04 Perforation 284.00 285.00 13
2000-07-04 Cement Squeeze 284.00 285.00 0
2000-07-04 Cement Squeeze 298.00 300.00 0
2000-07-07 Perforation 298.00 300.00 14
1987-06-11 Packing Device Capped w/Cement 1387.00 1395.00 0
1987-06-11 Perforation 1358.50 1360.50 13
1987-06-11 Perforation 1356.00 1358.00 13
1987-06-12 Fracture 1356.00 1360.50 0
1987-06-16 Packing Device Capped w/Cement 1342.00 1350.00 0
1987-06-16 Perforation 1325.00 1327.00 13
1987-06-16 Perforation 1332.00 1334.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 3436 0.0 0.0 0.0
1994 6588 0.0 0.0 0.0

For data sources see[5]

References