X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334213210000

Well Details

Well ID: 0334213210000
Loading map...
Location: 00/10-32-033-21W4/0
Location Alias: 00/10-32-33-21 W4M
Location Alias 2: 00/10-32-033-21 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 21
Section: 32
County/Municipality: Starland County
Well Name: TEAC RUMSEY 10-32-33-21
Operator Name: Trident Exploration (Alberta) Corp.
License Number: 0037292
License Date: 1969-12-01
License Status: RecCertified
Spud Date: 1969-12-04
Final Drill Date: 1969-12-12
Well Total Depth: 1524.00 m
Surface Hole Latitude: 51.877219
Surface Hole Longitude: -112.941286

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-12-01 Obtained License
1969-12-01 Perforation Treatment Performed - Jet Perforation
1969-12-12 Finished Drilling
1969-12-12 Well Mode changed to Drilled and Cased
1969-12-13 Drill Stem Test Performed
1969-12-14 Drill Stem Test Performed
1969-12-15 Drill Stem Test Performed
1969-12-16 Production Casing Operation Performed
1969-12-27 Well Began Production
1969-12-27 Well Fluid changed to Crude Oil
1969-12-27 Well Mode changed to Pumping
1970-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-02 Perforation Treatment Performed - Fractured
1977-07-29 Perforation Treatment Performed - Fractured
1997-11-01 Well Fluid changed to Crude Oil
1997-11-01 Well Mode changed to Suspended
1999-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-17 Plug Back Performed
1999-06-17 Well Fluid changed to Crude Oil
1999-06-17 Well Mode changed to Abandoned Zone
1999-07-13 Well Abandoned
1999-07-13 Well Fluid changed to Crude Oil
1999-07-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-12-01 Perforation 1484.40 1488.00 13
1970-01-02 Acid Treatment 1484.40 1488.00 0
1970-01-02 Fracture 1484.40 1488.00 0
1977-07-29 Fracture 1484.40 1488.00 0
1999-06-17 Packing Device Capped w/Cement 1462.00 1470.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 7768 0.0 0.0 0.0
1971 7966 0.0 0.0 0.0
1972 7460 0.0 0.0 0.0
1973 8327 0.0 0.0 0.0
1974 6388 0.0 0.0 0.0
1975 7511 0.0 0.0 0.0
1976 7163 0.0 0.0 0.0
1977 6920 0.0 0.0 0.0
1978 8204 0.0 0.0 0.0
1979 8470 0.0 0.0 0.0
1980 8705 0.0 0.0 0.0
1981 8532 0.0 0.0 0.0
1982 8523 0.0 0.0 0.0
1983 8409 0.0 0.0 0.0
1984 8345 0.0 0.0 0.0
1985 8512 0.0 0.0 0.0
1986 8505 0.0 0.0 0.0
1987 8724 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 8114 0.0 0.0 0.0
1990 8759 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8591 0.0 0.0 0.0
1994 8678 0.0 0.0 0.0
1995 8360 0.0 0.0 0.0
1996 8243 0.0 0.0 0.0
1997 2471 0.0 0.0 0.0

For data sources see[5]

References