If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0334261106002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.814489,"lon":-113.586453,"icon":""}]} |
Location: 00/06-11-033-26W4/2 | |
Location Alias: 00/06-11-33-26 W4M | |
Location Alias 2: 00/06-11-033-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 033 | |
Meridian: 4 | |
Range: 26 | |
Section: 11 | |
County/Municipality: Kneehill County | |
Well Name: Vantage WIM 6-11-33-26 | |
Operator Name: Vantage Point Resources Inc. | |
License Number: 0015779 | |
License Date: 1958-08-22 | |
License Status: Issued | |
Spud Date: 1958-09-03 | |
Final Drill Date: 1958-10-17 | |
Well Total Depth: 2306.70 m | |
Surface Hole Latitude: 51.814489 | |
Surface Hole Longitude: -113.586453 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-08-22 | Obtained License |
1958-09-12 | Drill Stem Test Performed |
1958-09-17 | Drill Stem Test Performed |
1958-09-18 | Drill Stem Test Performed |
1958-10-01 | Drill Stem Test Performed |
1958-10-03 | Drill Stem Test Performed |
1958-10-04 | Drill Stem Test Performed |
1958-10-06 | Drill Stem Test Performed |
1958-10-08 | Drill Stem Test Performed |
1958-10-10 | Drill Stem Test Performed |
1958-10-17 | Drill Stem Test Performed |
1958-10-17 | Finished Drilling |
1958-10-17 | Well Mode changed to Drilled and Cased |
1958-10-20 | Production Casing Operation Performed |
1958-10-22 | Perforation Treatment Performed - Jet Perforation |
1961-10-16 | Perforation Treatment Performed - Jet Perforation |
1961-10-22 | Perforation Treatment Performed - Jet Perforation |
1961-11-02 | Perforation Treatment Performed - Cement Squeeze |
1966-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-10-17 | Perforation Treatment Performed - Alcohol Squeeze |
1983-05-18 | Well Log Performed |
1983-06-15 | Perforation Treatment Performed - Jet Perforation |
1983-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-04-02 | Well Log Performed |
1984-04-04 | Perforation Treatment Performed - Jet Perforation |
1984-04-04 | Well Log Performed |
1985-07-15 | Well Log Performed |
1988-09-01 | Well Log Performed |
1988-09-02 | Well Log Performed |
1988-09-15 | Perforation Treatment Performed - Jet Perforation |
1988-09-15 | Well Log Performed |
1988-09-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-09-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-01-13 | Well Log Performed |
1989-01-19 | Well Log Performed |
1991-08-10 | Perforation Treatment Performed - Jet Perforation |
1991-09-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-06-16 | Plug Back Performed |
1997-06-18 | Well Log Performed |
2000-03-08 | Perforation Treatment Performed - Jet Perforation |
2000-03-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-03-13 | Well Began Production |
2000-03-13 | Well Fluid changed to Crude Oil |
2000-03-13 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1958-10-22 | Perforation | 2282.00 | 2283.60 | 13 |
1988-09-15 | Perforation | 2268.00 | 2269.50 | 13 |
1988-09-18 | Acid Treatment | 2268.00 | 2277.20 | 0 |
1988-09-23 | Acid Treatment | 2268.00 | 2277.20 | 0 |
1991-08-10 | Perforation | 2254.80 | 2259.00 | 20 |
1991-09-18 | Acid Treatment | 2254.80 | 2259.00 | 0 |
1996-06-16 | Packing Device Capped w/Cement | 2242.00 | 2250.00 | 0 |
2000-03-08 | Perforation | 2217.00 | 2220.00 | 17 |
2000-03-10 | Acid Treatment | 2217.00 | 2220.00 | 0 |
1961-10-16 | Perforation | 2269.20 | 2272.30 | 7 |
1961-10-22 | Perforation | 2264.10 | 2265.60 | 7 |
1961-11-02 | Cement Squeeze | 2264.10 | 2272.30 | 0 |
1966-08-29 | Acid Treatment | 2282.00 | 2283.60 | 0 |
1978-10-17 | Alchohol Squeeze | 2282.00 | 2283.60 | 0 |
1983-06-15 | Perforation | 2272.60 | 2273.80 | 13 |
1983-06-17 | Acid Treatment | 2272.60 | 2283.60 | 0 |
1984-04-04 | Perforation | 2274.10 | 2277.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 5928 | 0.0 | 0.0 | 0.0 |
2001 | 8595 | 0.0 | 0.0 | 0.0 |
2002 | 8009 | 0.0 | 0.0 | 0.0 |
2003 | 7913 | 0.0 | 0.0 | 0.0 |
2004 | 8668 | 0.0 | 0.0 | 0.0 |
2005 | 8589 | 0.0 | 0.0 | 0.0 |
2006 | 7368 | 0.0 | 0.0 | 0.0 |
2007 | 8566 | 0.0 | 0.0 | 0.0 |
2008 | 8584 | 0.0 | 0.0 | 0.0 |
2009 | 8380 | 0.0 | 0.0 | 0.0 |
2010 | 7958 | 0.0 | 0.0 | 0.0 |
2011 | 5722 | 0.0 | 0.0 | 0.0 |
2012 | 5581 | 0.0 | 0.0 | 0.0 |
2013 | 7952 | 0.0 | 0.0 | 0.0 |
2014 | 8434 | 0.0 | 0.0 | 0.0 |
2015 | 8520 | 0.0 | 0.0 | 0.0 |
2016 | 7560 | 0.0 | 0.0 | 0.0 |
2017 | 8216 | 0.0 | 0.0 | 0.0 |
2018 | 6414 | 0.0 | 0.0 | 0.0 |
2019 | 6899 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]