X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334262405000

Well Details

Well ID: 0334262405000
Loading map...
Location: 00/05-24-033-26W4/0
Location Alias: 00/05-24-33-26 W4M
Location Alias 2: 00/05-24-033-26 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 26
Section: 24
County/Municipality: Kneehill County
Well Name: Vantage WIM 5-24-33-26
Operator Name: Vantage Point Resources Inc.
License Number: 0013256
License Date: 1957-03-29
License Status: Suspension
Spud Date: 1957-04-01
Final Drill Date: 1957-05-07
Well Total Depth: 2304.30 m
Surface Hole Latitude: 51.843722
Surface Hole Longitude: -113.568686

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-03-29 Obtained License
1957-04-29 Drill Stem Test Performed
1957-05-02 Drill Stem Test Performed
1957-05-06 Drill Stem Test Performed
1957-05-07 Finished Drilling
1957-05-07 Well Mode changed to Drilled and Cased
1957-05-10 Production Casing Operation Performed
1957-05-12 Perforation Treatment Performed - Bullet Perforation
1957-05-15 Perforation Treatment Performed - Cement Squeeze
1957-05-18 Perforation Treatment Performed - Bullet Perforation
1957-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-05-20 Perforation Treatment Performed - Acid Wash - No Pressure
1957-05-26 Well Began Production
1957-05-26 Well Fluid changed to Crude Oil
1957-05-26 Well Mode changed to Flowing
1964-03-26 Perforation Treatment Performed - Jet Perforation
1964-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-03-27 Perforation Treatment Performed - Acid Wash - No Pressure
1964-03-31 Well Fluid changed to Crude Oil
1964-03-31 Well Mode changed to Flowing
1970-11-17 Well Fluid changed to Crude Oil
1970-11-17 Well Mode changed to Pumping
1972-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-05-13 Perforation Treatment Performed - Jet Perforation
1974-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-01-23 Perforation Treatment Performed - Jet Perforation
1980-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-09-22 Well Fluid changed to Crude Oil
1980-09-22 Well Mode changed to Abandoned Zone
1984-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-24 Perforation Treatment Performed - Jet Perforation
1991-01-25 Well Log Performed
1991-01-26 Well Log Performed
1991-01-28 Perforation Treatment Performed - Cement Squeeze
1991-01-31 Perforation Treatment Performed - Jet Perforation
1991-01-31 Well Log Performed
1991-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-15 Perforation Treatment Performed - Jet Perforation
1994-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-05-12 Bullet Perforation 2279.60 2280.50 13
1972-05-13 Perforation 2271.70 2272.90 7
1972-05-13 Acid Treatment 2271.70 2272.90 0
1974-01-23 Packing Device Capped w/Cement 2273.20 2273.20 0
1974-01-23 Perforation 2265.30 2265.90 13
1974-01-23 Perforation 2266.50 2267.10 13
1980-09-22 Packing Device Capped w/Cement 2233.00 2236.00 0
1980-09-22 Packing Device Capped w/Cement 2224.00 2231.60 0
1984-01-24 Acid Treatment 2218.30 2222.30 0
1987-10-20 Acid Treatment 2218.30 2222.30 0
1991-01-24 Perforation 2221.10 2222.60 16
1957-05-15 Cement Squeeze 2279.60 2280.50 0
1991-01-28 Cement Squeeze 2218.30 2222.60 0
1991-01-31 Perforation 2221.10 2222.60 16
1991-02-01 Acid Treatment 2221.10 2222.60 0
1994-09-15 Perforation 2217.00 2223.00 13
1994-09-17 Acid Treatment 2217.00 2224.00 0
1957-05-18 Bullet Perforation 2277.80 2278.40 13
1957-05-20 Acid Wash 2277.80 2278.40 0
1957-05-20 Acid Treatment 2277.80 2278.40 0
1964-03-26 Perforation 2221.40 2222.30 7
1964-03-26 Perforation 2218.30 2219.20 7
1964-03-27 Acid Wash 2218.30 2222.30 0
1964-03-27 Acid Treatment 2218.30 2222.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1311 0.0 0.0 0.0
1968 2188 0.0 0.0 0.0
1969 5624 0.0 0.0 0.0
1970 7007 0.0 0.0 0.0
1971 7572 0.0 0.0 0.0
1972 7423 0.0 0.0 0.0
1973 2861 0.0 0.0 0.0
1974 3179 0.0 0.0 0.0
1976 726 0.0 0.0 0.0

For data sources see[5]

References