X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0334263516000

Well Details

Well ID: 0334263516000
Loading map...
Location: 00/16-35-033-26W4/0
Location Alias: 00/16-35-33-26 W4M
Location Alias 2: 00/16-35-033-26 W4/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 4
Range: 26
Section: 35
County/Municipality: Kneehill County
Well Name: Vantage WIM 16-35-33-26
Operator Name: Vantage Point Resources Inc.
License Number: 0152239
License Date: 1992-04-13
License Status: Issued
Spud Date: 1992-04-29
Final Drill Date: 1992-05-12
Well Total Depth: 2227.00 m
Surface Hole Latitude: 51.881033
Surface Hole Longitude: -113.576842

For data sources see[1][2]

Well History

Date Event
1992-04-13 Obtained License
1992-04-30 Surface Casing Operation Performed
1992-05-07 Drill Stem Test Performed
1992-05-12 Finished Drilling
1992-05-12 Well Mode changed to Drilled and Cased
1992-05-13 Well Log Performed
1992-05-14 Drill Stem Test Performed
1992-05-15 Drill Stem Test Performed
1992-05-16 Drill Stem Test Performed
1992-05-18 Production Casing Operation Performed
1992-05-18 Rig Released
1992-05-26 Well Log Performed
1992-05-27 Perforation Treatment Performed - Jet Perforation
1992-05-27 Well Log Performed
1992-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-01 Perforation Treatment Performed - Jet Perforation
1992-06-01 Well Began Production
1992-06-01 Well Fluid changed to Crude Oil
1992-06-01 Well Log Performed
1992-06-01 Well Mode changed to Flowing
1992-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-09 Perforation Treatment Performed - Jet Perforation
1992-06-09 Well Log Performed
1992-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-06-19 Perforation Treatment Performed - Cement Squeeze
1992-08-13 Well Log Performed
1992-11-19 Perforation Treatment Performed - Cement Squeeze
1992-11-23 Perforation Treatment Performed - Jet Perforation
1992-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-12 Well Log Performed
1993-02-13 Perforation Treatment Performed - Jet Perforation
1993-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-05 Perforation Treatment Performed - Jet Perforation
1993-10-08 Perforation Treatment Performed - Cement Squeeze
1993-10-08 Plug Back Performed
1993-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-13 Perforation Treatment Performed - Jet Perforation
1993-10-15 Well Fluid changed to Crude Oil
1993-10-15 Well Mode changed to Pumping
1997-03-29 Well Log Performed
2010-07-08 Perforation Treatment Performed - Jet Perforation
2010-07-08 Well Log Performed
2011-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-05-27 Perforation 2204.50 2205.00 20
1992-11-24 Acid Treatment 2200.70 2202.00 0
1992-11-26 Acid Treatment 2200.70 2202.00 0
1993-02-13 Perforation 2200.90 2203.20 14
1993-02-19 Acid Treatment 2200.70 2203.20 0
1993-10-05 Perforation 2206.00 2207.00 18
1993-10-05 Acid Treatment 2200.70 2207.00 0
1993-10-08 Cement Squeeze 2206.00 2207.00 0
1993-10-13 Perforation 2204.00 2205.00 18
1993-10-13 Acid Treatment 2200.70 2205.00 0
2010-07-08 Perforation 2189.00 2194.00 13
1992-05-28 Acid Treatment 2204.50 2205.00 0
2011-10-16 Acid Treatment 2189.00 2205.00 0
1992-06-01 Perforation 2201.00 2202.00 20
1992-06-07 Acid Treatment 2201.00 2202.00 0
1992-06-09 Perforation 2195.00 2196.00 17
1992-06-11 Acid Treatment 2195.00 2196.00 0
1992-06-19 Cement Squeeze 2195.00 2196.00 0
1992-11-19 Cement Squeeze 2204.50 2205.00 0
1992-11-23 Perforation 2200.70 2201.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 2298 0.0 0.0 0.0
1993 4213 0.0 0.0 0.0
1994 5673 0.0 0.0 0.0
1995 5092 0.0 0.0 0.0
1996 4921 0.0 0.0 0.0
1997 6152 0.0 0.0 0.0
1998 6688 0.0 0.0 0.0
1999 7751 0.0 0.0 0.0
2000 7866 0.0 0.0 0.0
2001 8721 0.0 0.0 0.0
2002 7905 0.0 0.0 0.0
2003 6274 0.0 0.0 0.0
2004 7733 0.0 0.0 0.0
2005 7889 0.0 0.0 0.0
2006 7592 0.0 0.0 0.0
2007 8253 0.0 0.0 0.0
2008 7112 0.0 0.0 0.0
2009 8345 0.0 0.0 0.0
2010 803 0.0 0.0 0.0
2011 474 0.0 0.0 0.0
2012 4405 0.0 0.0 0.0
2013 8319 0.0 0.0 0.0
2014 7918 0.0 0.0 0.0
2015 7448 0.0 0.0 0.0
2016 7490 0.0 0.0 0.0
2017 8279 0.0 0.0 0.0
2018 8558 0.0 0.0 0.0
2019 7132 0.0 0.0 0.0
2020 1176 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-10-24 No Incident Encountered 0.00 0.00
2012-02-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References