X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335031401000

Well Details

Well ID: 0335031401000
Loading map...
Location: 00/01-14-033-03W5/0
Location Alias: 00/01-14-33-03 W5M
Location Alias 2: 00/01-14-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 14
County/Municipality: Mountain View County
Well Name: BONAVISTA HZ GARR 1-14-33-3
Operator Name: Bonavista Energy Corporation
License Number: 0419360
License Date: 2010-03-22
License Status: Issued
Spud Date: 2010-03-31
Final Drill Date: 2010-04-13
Well Total Depth: 3563.00 m
Surface Hole Latitude: 51.837984
Surface Hole Longitude: -114.309770

For data sources see[1][2]

Well History

Date Event
2010-03-22 Obtained License
2010-04-01 Surface Casing Operation Performed
2010-04-04 Direction Drilling Operation Performed - Horizontal
2010-04-07 Well Log Performed
2010-04-08 Intermediate Casing Operation Performed
2010-04-13 Finished Drilling
2010-04-13 Well Log Performed
2010-04-13 Well Mode changed to Drilled and Cased
2010-04-14 Liner Casing Operation Performed
2010-04-14 Perforation Treatment Performed - Open-Hole Completion
2010-04-14 Perforation Treatment Performed - Slotted Liner or Casing
2010-04-15 Liner Casing Operation Performed
2010-04-15 Perforation Treatment Performed - Slotted Liner or Casing
2010-04-16 Rig Released
2010-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-05-25 Well Began Production
2010-05-25 Well Fluid changed to Gas
2010-05-25 Well Mode changed to Pumping
2020-04-01 Well Fluid changed to Gas
2020-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-04-04 2276.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-14 Open Hole/Barefoot Completion 2509.50 3563.00 0
2010-04-14 Slotted Liner 2509.50 2940.00 0
2010-04-15 Slotted Liner 2509.50 2781.00 0
2010-04-27 Acid Treatment 2941.00 3563.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5224 0.0 0.0 0.0
2011 8676 0.0 0.0 0.0
2012 7423 0.0 0.0 0.0
2013 8735 0.0 0.0 0.0
2014 8418 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8543 0.0 0.0 0.0
2017 8661 0.0 0.0 0.0
2018 8560 0.0 0.0 0.0
2019 8298 0.0 0.0 0.0
2020 2088 0.0 0.0 0.0

For data sources see[6]

References