X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335031602000

Well Details

Well ID: 0335031602000
Loading map...
Location: 00/02-16-033-03W5/0
Location Alias: 00/02-16-33-03 W5M
Location Alias 2: 00/02-16-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 16
County/Municipality: Mountain View County
Well Name: WHITECAP GARR 2-16-33-3
Operator Name: Whitecap Resources Inc.
License Number: 0426521
License Date: 2010-11-29
License Status: Issued
Spud Date: 2010-12-04
Final Drill Date: 2010-12-15
Well Total Depth: 3513.00 m
Surface Hole Latitude: 51.840504
Surface Hole Longitude: -114.364365

For data sources see[1][2]

Well History

Date Event
2010-11-29 Obtained License
2010-12-05 Surface Casing Operation Performed
2010-12-07 Direction Drilling Operation Performed - Horizontal
2010-12-07 Well Log Performed
2010-12-09 Intermediate Casing Operation Performed
2010-12-15 Finished Drilling
2010-12-15 Well Mode changed to Drilled and Cased
2010-12-17 Liner Casing Operation Performed
2010-12-17 Rig Released
2011-01-10 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-15 Well Began Production
2011-01-15 Well Fluid changed to Crude Oil
2011-01-15 Well Mode changed to Flowing
2011-02-05 Well Log Performed
2013-07-01 Well Fluid changed to Crude Oil
2013-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-07 1668.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-10 Multi-Stage Fracture 3444.10 3444.20 0
2011-01-10 Multi-Stage Fracture 2710.40 2710.50 0
2011-01-10 Multi-Stage Fracture 2612.40 2612.50 0
2011-01-10 Multi-Stage Fracture 2526.80 2526.90 0
2011-01-10 Multi-Stage Fracture 2440.40 2440.50 0
2011-01-10 Multi-Stage Fracture 2365.90 2366.00 0
2011-01-10 Multi-Stage Fracture 2290.60 2290.70 0
2011-01-10 Multi-Stage Fracture 2215.20 2215.30 0
2011-01-10 Multi-Stage Fracture 2140.10 2140.20 0
2011-01-10 Multi-Stage Fracture 2065.20 2065.30 0
2011-01-10 Multi-Stage Fracture 3403.60 3403.70 0
2011-01-10 Multi-Stage Fracture 3316.90 3317.00 0
2011-01-10 Multi-Stage Fracture 3230.10 3230.20 0
2011-01-10 Multi-Stage Fracture 3143.30 3143.40 0
2011-01-10 Multi-Stage Fracture 3056.60 3056.70 0
2011-01-10 Multi-Stage Fracture 2970.00 2970.10 0
2011-01-10 Multi-Stage Fracture 2883.40 2883.50 0
2011-01-10 Multi-Stage Fracture 2797.20 2797.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7564 0.0 0.0 0.0
2012 8539 0.0 0.0 0.0
2013 8441 0.0 0.0 0.0
2014 8246 0.0 0.0 0.0
2015 8712 0.0 0.0 0.0
2016 8733 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8631 0.0 0.0 0.0
2019 8476 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[6]

References