X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335032104000

Well Details

Well ID: 0335032104000
Loading map...
Location: 00/04-21-033-03W5/0
Location Alias: 00/04-21-33-03 W5M
Location Alias 2: 00/04-21-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 21
County/Municipality: Mountain View County
Well Name: WHITECAP GARR 4-21-33-3
Operator Name: Whitecap Resources Inc.
License Number: 0455874
License Date: 2013-03-08
License Status: Issued
Spud Date: 2013-04-28
Final Drill Date: 2013-05-09
Well Total Depth: 4047.00 m
Surface Hole Latitude: 51.859521
Surface Hole Longitude: -114.374651

For data sources see[1][2]

Well History

Date Event
2013-03-08 Obtained License
2013-04-30 Surface Casing Operation Performed
2013-05-02 Direction Drilling Operation Performed - Deviate
2013-05-05 Intermediate Casing Operation Performed
2013-05-06 Direction Drilling Operation Performed - Horizontal
2013-05-09 Finished Drilling
2013-05-09 Well Log Performed
2013-05-09 Well Mode changed to Drilled and Cased
2013-05-11 Liner Casing Operation Performed
2013-05-12 Rig Released
2013-05-14 Well Log Performed
2013-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-05-18 Perforation Treatment Performed - Open-Hole Completion
2013-05-18 Well Began Production
2013-05-18 Well Fluid changed to Crude Oil
2013-05-18 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-04-28 Precision Drilling Corporation 324 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-05-02 1621.00 Deviate (5 - 79 degrees)
2013-05-06 2180.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-05-18 Open Hole/Barefoot Completion 4045.00 4047.00 0
2013-05-18 Multi-Stage Fracture 3493.10 3493.20 0
2013-05-18 Multi-Stage Fracture 3434.10 3434.20 0
2013-05-18 Multi-Stage Fracture 3361.80 3361.90 0
2013-05-18 Multi-Stage Fracture 3302.90 3303.00 0
2013-05-18 Multi-Stage Fracture 3243.90 3244.00 0
2013-05-18 Multi-Stage Fracture 3171.40 3171.50 0
2013-05-18 Multi-Stage Fracture 3112.50 3112.60 0
2013-05-18 Multi-Stage Fracture 3040.20 3040.30 0
2013-05-18 Multi-Stage Fracture 2981.50 2981.60 0
2013-05-18 Multi-Stage Fracture 2909.20 2909.30 0
2013-05-18 Multi-Stage Fracture 4009.00 4009.10 0
2013-05-18 Multi-Stage Fracture 2850.30 2850.40 0
2013-05-18 Multi-Stage Fracture 2791.60 2791.70 0
2013-05-18 Multi-Stage Fracture 2719.40 2719.50 0
2013-05-18 Multi-Stage Fracture 2660.50 2660.60 0
2013-05-18 Multi-Stage Fracture 2588.20 2588.30 0
2013-05-18 Multi-Stage Fracture 2529.50 2529.60 0
2013-05-18 Multi-Stage Fracture 2457.30 2457.40 0
2013-05-18 Multi-Stage Fracture 2398.50 2398.60 0
2013-05-18 Multi-Stage Fracture 2326.20 2326.30 0
2013-05-18 Multi-Stage Fracture 2267.80 2267.90 0
2013-05-18 Multi-Stage Fracture 3946.00 3946.10 0
2013-05-18 Multi-Stage Fracture 2209.40 2209.50 0
2013-05-18 Multi-Stage Fracture 2137.00 2137.10 0
2013-05-18 Multi-Stage Fracture 3887.00 3887.10 0
2013-05-18 Multi-Stage Fracture 3814.70 3814.80 0
2013-05-18 Multi-Stage Fracture 3755.80 3755.90 0
2013-05-18 Multi-Stage Fracture 3696.90 3697.00 0
2013-05-18 Multi-Stage Fracture 3624.30 3624.40 0
2013-05-18 Multi-Stage Fracture 3565.60 3565.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-18 2013-05-18 1,934 3,072 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 80.5814 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 6.969 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.5098 N/A
Tolcide PS75LT Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0116 N/A
Water 7732-18-5 100 0.0126 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0729 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0836 N/A
Ethoxylated phenolic resin 8300 100 0.0864 N/A
Isobutyl ketone 8300 100 0.0836 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1128 N/A
Organic acid salts 1 8300 100 0.0836 N/A
Organic acid salts 2 8300 100 0.0857 N/A
Organic acid salts 3 8300 100 0.0864 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 5.012 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.085 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-05-14 2013-05-14 Recycled Fracturing Water (treated at well site) 193
2013-05-15 2013-05-17 Surface Water - River 3943

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5429 0.0 0.0 0.0
2014 8651 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8428 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-01 No Incident Encountered 0.00 0.00
2013-05-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References