If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0335032201020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.853978,"lon":-114.331129,"icon":""}]} |
| Location: 02/01-22-033-03W5/0 | |
| Location Alias: 02/01-22-33-03 W5M | |
| Location Alias 2: 02/01-22-033-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 033 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 22 | |
| County/Municipality: Mountain View County | |
| Well Name: BACCALIEU HZ GARR 1-22-33-3 | |
| Operator Name: Baccalieu Energy Inc. | |
| License Number: 0447518 | |
| License Date: 2012-08-01 | |
| License Status: Issued | |
| Spud Date: 2012-10-09 | |
| Final Drill Date: 2012-10-19 | |
| Well Total Depth: 3501.00 m | |
| Surface Hole Latitude: 51.853978 | |
| Surface Hole Longitude: -114.331129 |
| Date | Event |
|---|---|
| 2012-08-01 | Obtained License |
| 2012-10-10 | Surface Casing Operation Performed |
| 2012-10-12 | Direction Drilling Operation Performed - Deviate |
| 2012-10-13 | Direction Drilling Operation Performed - Horizontal |
| 2012-10-15 | Intermediate Casing Operation Performed |
| 2012-10-15 | Well Log Performed |
| 2012-10-19 | Finished Drilling |
| 2012-10-19 | Well Mode changed to Drilled and Cased |
| 2012-10-21 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-10-22 | Liner Casing Operation Performed |
| 2012-10-22 | Rig Released |
| 2012-10-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-11-01 | Well Began Production |
| 2012-11-01 | Well Fluid changed to Crude Oil |
| 2012-11-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-10-09 | Ensign Drilling Inc. | 544 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-10-12 | 1648.00 | Deviate (5 - 79 degrees) |
| 2012-10-13 | 2080.60 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-21 | Open Hole/Barefoot Completion | 3496.00 | 3501.00 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2914.50 | 2914.60 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2854.10 | 2854.20 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2781.80 | 2781.90 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2721.10 | 2721.20 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2648.30 | 2648.40 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2587.90 | 2588.00 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2514.00 | 2514.10 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2454.10 | 2454.20 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2379.60 | 2379.70 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2319.10 | 2319.20 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 3440.90 | 3441.00 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2243.60 | 2243.70 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2199.50 | 2199.60 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 3392.20 | 3392.30 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 3318.90 | 3319.00 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 3259.10 | 3259.20 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 3184.30 | 3184.40 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 3124.00 | 3124.10 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 3050.30 | 3050.40 | 0 |
| 2012-10-31 | Multi-Stage Fracture | 2989.30 | 2989.40 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1464 | 0.0 | 0.0 | 0.0 |
| 2013 | 8721 | 0.0 | 0.0 | 0.0 |
| 2014 | 8552 | 0.0 | 0.0 | 0.0 |
| 2015 | 8745 | 0.0 | 0.0 | 0.0 |
| 2016 | 8759 | 0.0 | 0.0 | 0.0 |
| 2017 | 8711 | 0.0 | 0.0 | 0.0 |
| 2018 | 8713 | 0.0 | 0.0 | 0.0 |
| 2019 | 8579 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-22 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]