X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335032207000

Well Details

Well ID: 0335032207000
Loading map...
Location: 00/07-22-033-03W5/0
Location Alias: 00/07-22-33-03 W5M
Location Alias 2: 00/07-22-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 22
County/Municipality: Mountain View County
Well Name: NAL GARR 7-22-33-3
Operator Name: NAL Resources Limited
License Number: 0064717
License Date: 1977-07-12
License Status: Amended
Spud Date: 1977-08-08
Final Drill Date: 1977-08-31
Well Total Depth: 2506.40 m
Surface Hole Latitude: 51.843704
Surface Hole Longitude: -114.339515

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-12 Obtained License
1977-08-22 Drill Stem Test Performed
1977-08-31 Finished Drilling
1977-09-02 Well Log Performed
1977-09-03 Drill Stem Test Performed
1977-09-04 Drill Stem Test Performed
1977-09-05 Production Casing Operation Performed
1977-10-07 Perforation Treatment Performed - Jet Perforation
1977-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-10-11 Perforation Treatment Performed - Fractured
1977-11-22 Perforation Treatment Performed - Jet Perforation
1977-12-02 Well Mode changed to Drilled and Cased
1983-12-05 Well Log Performed
1983-12-06 Well Log Performed
1983-12-07 Perforation Treatment Performed - Cement Squeeze
1983-12-08 Perforation Treatment Performed - Jet Perforation
1983-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-13 Perforation Treatment Performed - Fractured
1984-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-01-21 Perforation Treatment Performed - Jet Perforation
1984-02-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-02-18 Perforation Treatment Performed - Jet Perforation
1984-02-19 Perforation Treatment Performed - Fractured
1988-01-20 Well Fluid changed to Crude Oil
1988-01-20 Well Mode changed to Potential
1988-01-21 Well Fluid changed to Crude Oil
1988-01-21 Well Mode changed to Abandoned Zone
1989-05-29 Perforation Treatment Performed - Jet Perforation
1989-05-31 Perforation Treatment Performed - Cement Squeeze
1989-05-31 Plug Back Performed
1989-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-07 Perforation Treatment Performed - Jet Perforation
1997-06-06 Well Fluid changed to Crude Oil
1997-06-06 Well Mode changed to Abandoned and Whipstocked
1997-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-07 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-10-07 Perforation 2473.80 2476.20 7
1984-01-13 Fracture 2216.50 2221.30 0
1984-01-21 Packing Device Capped w/Cement 2206.00 2214.00 0
1984-01-21 Perforation 1973.00 1974.50 13
1984-02-16 Acid Treatment 1973.00 1974.50 0
1984-02-17 Acid Treatment 1973.00 1974.50 0
1984-02-18 Perforation 1973.00 1974.50 13
1984-02-19 Fracture 1973.00 1974.50 0
1989-05-29 Perforation 2216.50 2221.30 13
1989-05-31 Cement Squeeze 2216.50 2221.30 0
1989-05-31 Cement Squeeze 1973.00 1974.50 0
1977-10-07 Perforation 2479.20 2482.90 7
1989-06-28 Acid Treatment 2473.80 2482.90 0
1996-10-07 Perforation 2470.00 2483.00 13
1997-06-07 Packing Device Capped w/Cement 2457.00 2465.00 0
1977-10-09 Acid Treatment 2473.80 2482.90 0
1977-10-11 Fracture 2473.80 2482.90 0
1977-11-22 Perforation 2449.70 2450.90 13
1977-11-22 Perforation 2433.50 2434.40 13
1983-12-07 Cement Squeeze 2433.50 2450.90 0
1983-12-08 Perforation 2216.50 2221.30 13
1983-12-10 Acid Treatment 2216.50 2221.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 1 0.0 0.0 0.0

For data sources see[5]

References