X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335033007000

Well Details

Well ID: 0335033007000
Loading map...
Location: 00/07-30-033-03W5/0
Location Alias: 00/07-30-33-03 W5M
Location Alias 2: 00/07-30-033-03 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 03
Section: 30
County/Municipality: Mountain View County
Well Name: BEC GARR 7-30-33-3
Operator Name: Bonavista Energy Corporation
License Number: 0050156
License Date: 1974-06-18
License Status: Issued
Spud Date: 1974-06-23
Final Drill Date: 1974-07-24
Well Total Depth: 2590.80 m
Surface Hole Latitude: 51.857706
Surface Hole Longitude: -114.410465

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-06-18 Obtained License
1974-07-21 Drill Stem Test Performed
1974-07-24 Finished Drilling
1974-07-25 Drill Stem Test Performed
1974-07-25 Well Mode changed to Drilled and Cased
1974-07-27 Production Casing Operation Performed
1974-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-08-24 Perforation Treatment Performed - Jet Perforation
1974-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-10-08 Perforation Treatment Performed - Jet Perforation
1974-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-12-02 Perforation Treatment Performed - Cement Squeeze
1976-12-08 Perforation Treatment Performed - Cement Squeeze
1976-12-20 Perforation Treatment Performed - Jet Perforation
1994-06-13 Well Began Production
1994-06-13 Well Fluid changed to Gas
1994-06-13 Well Mode changed to Flowing
1997-03-18 Perforation Treatment Performed - Jet Perforation
2006-03-28 Well Fluid changed to Gas
2006-03-28 Well Mode changed to Pumping
2007-11-13 Well Log Performed
2007-11-27 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-08-24 Perforation 2557.90 2564.00 7
1976-12-20 Perforation 2557.90 2564.00 7
1997-03-18 Perforation 2562.00 2568.50 7
1974-08-24 Acid Treatment 2557.90 2564.00 0
1974-09-06 Packing Device Capped w/Cement 2537.50 2552.70 0
1974-10-05 Packing Device Capped w/Cement 2488.10 2491.10 0
1974-10-08 Perforation 2470.10 2471.90 7
1974-10-08 Perforation 2477.70 2479.20 7
1974-10-12 Acid Treatment 2470.10 2479.20 0
1976-12-02 Cement Squeeze 2470.10 2479.20 0
1976-12-08 Cement Squeeze 2470.10 2479.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 1 0.0 0.0 0.0
1993 48 0.0 0.0 0.0
1994 3190 0.0 0.0 0.0
1995 8609 0.0 0.0 0.0
1996 8013 0.0 0.0 0.0
1997 8105 0.0 0.0 0.0
1998 8577 0.0 0.0 0.0
1999 8466 0.0 0.0 0.0
2000 8493 0.0 0.0 0.0
2001 8573 0.0 0.0 0.0
2002 8471 0.0 0.0 0.0
2003 8539 0.0 0.0 0.0
2004 8093 0.0 0.0 0.0
2005 8232 0.0 0.0 0.0
2006 8130 0.0 0.0 0.0
2007 7634 0.0 0.0 0.0
2008 7872 0.0 0.0 0.0
2009 8448 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8159 0.0 0.0 0.0
2012 8613 0.0 0.0 0.0
2013 8273 0.0 0.0 0.0
2014 8543 0.0 0.0 0.0
2015 8087 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8701 0.0 0.0 0.0
2018 5183 0.0 0.0 0.0
2019 7939 0.0 0.0 0.0
2020 2156 0.0 0.0 0.0

For data sources see[5]

References