X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0335040201000

Well Details

Well ID: 0335040201000
Loading map...
Location: 00/01-02-033-04W5/0
Location Alias: 00/01-02-33-04 W5M
Location Alias 2: 00/01-02-033-04 W5/00
Country: Canada
Province: Alberta
Township: 033
Meridian: 5
Range: 04
Section: 02
County/Municipality: Mountain View County
Well Name: NAL HARME 1-2-33-4
Operator Name: NAL Resources Limited
License Number: 0468797
License Date: 2014-08-01
License Status: Issued
Spud Date: 2014-09-16
Final Drill Date: 2014-09-24
Well Total Depth: 3393.00 m
Surface Hole Latitude: 51.808973
Surface Hole Longitude: -114.454579

For data sources see[1][2]

Well History

Date Event
2014-08-01 Obtained License
2014-09-18 Surface Casing Operation Performed
2014-09-20 Direction Drilling Operation Performed - Deviate
2014-09-21 Direction Drilling Operation Performed - Horizontal
2014-09-21 Well Log Performed
2014-09-24 Finished Drilling
2014-09-24 Perforation Treatment Performed - Open-Hole Completion
2014-09-24 Well Log Performed
2014-09-24 Well Mode changed to Drilled and Cased
2014-09-25 Production Casing Operation Performed
2014-09-27 Rig Released
2014-09-30 Well Log Performed
2014-10-10 Perforation Treatment Performed - Multi-Stage Fracture
2014-10-14 Well Log Performed
2014-10-28 Well Began Production
2014-10-28 Well Fluid changed to Crude Oil
2014-10-28 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-16 Horizon Drilling Inc. 39 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-20 1781.70 Deviate (5 - 79 degrees)
2014-09-21 2137.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-09-24 Open Hole/Barefoot Completion 3387.00 3393.00 0
2014-10-10 Multi-Stage Fracture 2771.60 2771.70 0
2014-10-10 Multi-Stage Fracture 2847.10 2847.20 0
2014-10-10 Multi-Stage Fracture 2909.50 2909.60 0
2014-10-10 Multi-Stage Fracture 2971.40 2971.50 0
2014-10-10 Multi-Stage Fracture 3047.80 3047.90 0
2014-10-10 Multi-Stage Fracture 3110.00 3110.10 0
2014-10-10 Multi-Stage Fracture 3185.40 3185.50 0
2014-10-10 Multi-Stage Fracture 3247.60 3247.70 0
2014-10-10 Multi-Stage Fracture 3324.60 3324.70 0
2014-10-10 Multi-Stage Fracture 3375.70 3375.80 0
2014-10-10 Multi-Stage Fracture 2230.70 2230.80 0
2014-10-10 Multi-Stage Fracture 2293.40 2293.50 0
2014-10-10 Multi-Stage Fracture 2356.00 2356.10 0
2014-10-10 Multi-Stage Fracture 2432.70 2432.80 0
2014-10-10 Multi-Stage Fracture 2495.30 2495.40 0
2014-10-10 Multi-Stage Fracture 2570.60 2570.70 0
2014-10-10 Multi-Stage Fracture 2633.00 2633.10 0
2014-10-10 Multi-Stage Fracture 2709.10 2709.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-10 2014-10-10 2,051 2,898 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 91.177 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 0.5527 N/A
Crystalline silica. quartz 14808-60-7 100 0.5527 N/A
Iron Oxide 1309-37-1 100 0.5527 N/A
Titanium Oxide 13463-67-7 100 0.5527 N/A
Sand (30/50) Canyon Aluminum Oxide 1344-28-1 100 1.8207 N/A
Crystalline silica. quartz 14808-60-7 100 1.8207 N/A
Iron Oxide 1309-37-1 100 1.8207 N/A
Titanium Oxide 13463-67-7 100 1.8206 N/A
Sand (40/70) Canyon Aluminum Oxide 1344-28-1 100 3.869 N/A
Crystalline silica. quartz 14808-60-7 100 3.869 N/A
Iron Oxide 1309-37-1 100 3.869 N/A
Titanium Oxide 13463-67-7 100 3.869 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 0.5852 N/A
Crystalline silica. quartz 14808-60-7 100 0.5852 N/A
Iron Oxide 1309-37-1 100 0.5852 N/A
Titanium Oxide 13463-67-7 100 0.5852 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0255 N/A
Water 7732-18-5 100 0.0255 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0992 N/A
Water 7732-18-5 100 0.0992 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 2.4671 N/A
Non-hazardous base ingredient(s) Not Available 100 2.4671 N/A
CAN-2057 Friction Reducer Canyon Friction Reducer No hazardous ingredients Not Available 100 0.0488 N/A
CAN-1402 Scale Inhibitor Canyon Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0227 N/A
Potassium Chloride 7447-40-7 100 0.0227 N/A
Water 7732-18-5 100 0.0227 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0903 N/A
Methanol 67-56-1 100 0.0903 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0903 N/A
Water 7732-18-5 100 0.0903 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-09-30 2014-10-10 Surface Water - River 3584

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1418 0.0 0.0 0.0
2015 8588 0.0 0.0 0.0
2016 8701 0.0 0.0 0.0
2017 8751 0.0 0.0 0.0
2018 8563 0.0 0.0 0.0
2019 8578 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-09-29 No Incident Encountered 0.00 0.00
2014-10-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References